COMPACT-90 Concrete Plant
546 827 THE VILLAGE
Enquire conditions
and delivery time
We'll call you back within 15 minutes
Specify your requirements
Send prices and terms of delivery
253 738 THE VILLAGE
- Twin-shaft concrete mixer for 2250 liters
- Frame for skip hoist installation
- Skip displacement of 2.5 cc. m
- The winch drive - 22 kW with electro-brake
- Pneumolock double
- Connection set for pneumatic equipment
- Armor shift flake type. Material: cast iron wear 16 mm
- Спицы усиленные (стальное литье) крепление типа "кулак"
- Changeable blades. Material: ЧХ16Н2Т cast iron (chromic high alloy wear-resistant)
- Automatic central lubrication system
- Electricity to connect the remote control
- Maintenance kit (three armor, blade, needle)
- Concrete mixer machinery certificate
45 102 THE VILLAGE
- Mounting frame, mobile. Installation without foundation
- Design enhanced, adapted for the discharge of concrete on the height of 4000 mm
- mixer platform with supporting structures
- Ladders for equipment maintenance
- Fence along the perimeter
- Staircase with handrails
- Funnel for unloading concrete with rubber guide
- Skip ways - rails
- Fastening construction for pipes and electric cables
- Coating: shotblasting, double coloration with drying chamber
- Reinforced and protected operator's cab installation place
136 996 THE VILLAGE
- Mounting frame. Installation without foundation
- Bunkers of inert materials 3 pieces of 18 m³ (3 x 18)
- Preparation under registers installation for heating inert materials
- Pneumatic valves - 6 pieces
- Pneumatic dampers - 6 pieces
- Filter regulator - 1 piece
- Vibrators MVE 3003 - 6 pieces
- Inert materials belt conveyor (dosage - 0-3000 kg). Belt speed - 1.6 m/sec
- Lined drive drum motor 18.5 kW with soft start system (when ordered with remote control)
- Drum tension station
- Load cells SBA-3000 - 4 pieces
- CAS connecting box
- Signal amplifier - weight sensor
36 027 THE VILLAGE
- Software on your own SCADA system complete with a monoblock: accounting for the consumption of materials and equipment operation, remote access and control over the work in the local network
- Automatic operation by pressing "one" button
- Recipe storage database for concrete production
- Programmable Logic Controller
- Сontrol panel case protection - IP54
- Power cabinet case protection - IP54
- Control, protective and switching equipment "Omron", "Siemens"
- Set of diagrams and instruction manual
45 738 THE VILLAGE
- Mounting frame (powder coating). Weight - 200 kg
- Cement dispenser, dosage - 900 kg (powder coating):
- Three inlet pipes for augers (Two are covered with lids)
- Connecting outer sheath with collar clamps
- Overpressure system
- Unloading disc damper ∅200
- Strain gauges - 3 pcs.
- Signal amplifier - weight converter - 3 pcs.
- Pneumatic distributors - 3 pcs.
- Vibrator MVE 300/3 - 1 pc.
- Water dispenser, dosage - 450 liters (powder coating):
- Strain gauges - 3 pcs.
- Unloading ball pneumatic damper ∅50 - 2 pcs.
- Water dump pump
- Controlled water and chemical supply system
- Chemical additives dispenser, dosage - 60 liters, made of stainless steel:
- Strain gauges - 1 piece
16 582 THE VILLAGE
- Hardware for assembly RBU: metering complex overpass screw silage
- Hardware, accessories
- Wire for screw fixing
- Kit for connecting the database (pnevmotruba, sleeves, bends, RVC 51-70 clamps, duct PVC-5-C-60)
- Limit switch for the database
- Kit vodopodvedeniya (pipe bends, sleeves, T-joints, anchor bolts, brackets)
- Kit RBU pneumatic (air tubing, pnevmotruba, fittings, hardware)
- Set of cables
- Couplings (5 titles)
- compactor
- Acid sealant TempPlus
- Power and control cables, protected by metal hose (in mobile plants they are laid in frame)
- Set of locking sensors and executing mechanisms position sensors (skip, mixer's gate, etc.)
7 458 THE VILLAGE
- Operator's cabin. Sheathed by zinc-coated painted profiled sheeting, finishing accessories, moisture protecting impregnation
- Frame protected against corrosion, 60 mm thick heat insulation
- Sound insulation, protection against rain
- One window (PVC, double glazing), insulated door with lock
- Lighting
- Slinging loops
- Weight - 180 kg
21 191 THE VILLAGE
- Auger assembly
- Pipe Diameter 273 mm, tube length of 12 000 mm
- Drive: gear motor. Power 15 kW
- Inspection window for cleaning and maintenance
- Operational documentation
157 556 THE VILLAGE
- Twin-shaft concrete mixer MAO 2250
- Multi-channel uniform water spray system
- Replaceable wear-resistant Ni-Hard cast iron armor, strength 500 HB
- Pneumatic gate - two-side
- Connection set for pneumatic equipment
201 573 THE VILLAGE
- Planetary concrete mixer MPC 2250
- Mixer drive - 74 kW
- Replaceable wear-resistant armor made of cast iron with a strength of 500HB
- The sector valve with rubber seal is equipped with a hydraulic drive with the possibility of manual opening
- Water treatment system with water spray nozzles
- Inspection hatches are equipped with an access security system
2 178 THE VILLAGE
- Pump PSTC 65-125/75 assembled for water supply
- Machinery certificate
3 480 THE VILLAGE
- Lattice on the section of the bunker 70x70 for DK-36 (DK-54) - RBU-2G-60AK-05.08.000
2 476 THE VILLAGE
- Lattice on the section of the bunker 100x100 for DK-36 (DK-54) - RBU-2G-60AK-05.08.000-01
1 751 THE VILLAGE
- The pump Calpeda MXH 202E assembled for chemical supply. additives
- Capacity - 80 liters/min
- Power - 0.33 kW
- Weight - 6.9 kg with packaging
- Machinery certificate
2 063 THE VILLAGE
- Aeration jet - 16 pcs
- Assembly kit (fittings, tees, polyurethane tube, bracket, nipple, gasket, plug)
- Filter regulator - 1 pc.
- Ball valve G1/4 - 2pcs
- Axial pressure gauge, 0-2.5 bar - 1 pc.
- 3/2 distributor G1/4, unilateral. - 1 PC
- Solenoid - 1 pc
- Solenoid connector - 1 pc
2 237 THE VILLAGE
- Aeration jet - 18 pcs
- Assembly kit (fittings, tees, polyurethane tube, bracket, nipple, gasket, plug)
- Filter regulator - 1 pc.
- Ball valve G1/4 - 2pcs
- Axial pressure gauge, 0-2.5 bar - 1 pc.
- 3/2 distributor G1/4, unilateral. - 1 PC
- Solenoid - 1 pc
- Solenoid connector - 1 pc
2 286 THE VILLAGE
- Aeration jet - 18 pcs
- Assembly kit (fittings, tees, polyurethane tube, bracket, nipple, gasket, plug)
- Filter regulator - 1 pc.
- Ball valve G1/4 - 2pcs
- Axial pressure gauge, 0-2.5 bar - 1 pc.
- 3/2 distributor G1/4, unilateral. - 1 PC
- Solenoid - 1 pc
- Solenoid connector - 1 pc
66 178 THE VILLAGE
- Heat generator TGV-250 basic version
- Fan assembled with an electric motor type Fan VR 140-15 No. 8 version 1, 22 kW, 3000 rpm, left. 270. 380/660
- The automation system (control cabinet)
- chimney section
- Schild in the control cabinet
- Passport and Manual
79 333 THE VILLAGE
- Silo bank (V=103m³)
- Mounting frame
- Stairs
- Cover protection enclosure
- Loading pipe d 102 with connection lock
- Connecting flanges for installation cement filter emergency valve, level sensors, aeration and vibrator
- Shot peening prior to application to the extent Sa 2 1/2 GOST P ISO 8501-1-2014
- Anti-corrosion protection is made with a two-component primer-enamel PentriProtect PUR 700 based on polyurethane-acrylic resin in the ATIS spray booth
- Machinery certificate
893 THE VILLAGE
- Emergency pressure relief valve PV273 assy
- Adjusting ring
- Operational documentation
471 THE VILLAGE
- Cement level sensor G2 1/2 220V assy in a package
- Adjusting ring
- Operational documentation
782 THE VILLAGE
- Butterfly valve DN300
- Handle for gate control
- Operational documentation
73 911 THE VILLAGE
- Silo tank (V = 105 m3): cover - 4 sectors, cylindrical section - 28 sectors, large cone - 4 sectors, small cone
- Mounting frame
- Stairs
- Cover protection enclosure - 11 sectors
- Loading pipe d 102 with connection lock
- Inspection hatch (Viewing window for inspection and cleaning of the cone)
- Connecting flanges for installation cement filter emergency valve, level sensors, aeration and vibrator
- Shot peening prior to application to the extent Sa 2 1/2 GOST P ISO 8501-1-2014
- Anti-corrosion protection is made with a two-component primer-enamel PentriProtect PUR 700 based on polyurethane-acrylic resin in the ATIS spray booth
- Frame for transportation
- Hardware for the assembly of a silo
- Polyurethane sealant Soudaflex FC 40 gray 600 ml - 15 tubes
- Machinery certificate
484 THE VILLAGE
- safety valve
- Adjusting ring
- Material - Carbon Steel
- Compound - a collar
- Passport to Safety Valve
The work of the concrete plant COMPACT-90 takes place in automatic mode in accordance with the single button principle. The operator needs to choose grade of concrete (M50 ... M500) and its quantity to be loaded into the mixer truck, press the “cycle start” button.
PA-3.0 SCADA-5.0 control panel with monoblock located in the operator's cabin, which can be installed in two positions when working: transport (built into the frame) or next to the concrete plant, a convenient place for work.
All components of the plant are mounted on a frame, which is installed on a flat area, No foundation or skip pit needed.
BP-2G-2250s Twin-shaft concrete mixer is mounted on an elevated structure. Discharge height - 4 m. The concrete mixer is equipped with a skip for mixture hoisting and feeding.
For storage and dispensing inert materials: DKM-54 batching complex. There are three hoppers of 18 cu m each. Total capacity is 54 cu m. . A dosing belt conveyor is installed under the bunkers, on which components are dispensed; the components are supplied from the bunkers by opening Camozzi pneumatic valves (Italy). When the required dose of inerts has been collected, the conveyor is turned on and the inerts are fed into a skip, which lifts the components into the concrete mixer.
The cement is stored in a special warehouse - cement silo (not included in the basic package). Silos for cement must be selected based on a two-day performance margin. To supply cement from the silo to the cement dispenser, it is necessary to acquire the correct length screw.
Cement silos, silo piping and augers are always available at ZZBO warehouses in Zlatoust!
Using cement screw fed into the cement batcher (weighing capacity of 900 kg) in which the batching, where appropriate cement is discharged into the mixer.
Water is dosed using a 450 liter water dispenser. All components of the mixture are mixed, after obtaining the necessary homogeneity of the mixture, the pneumatic valve is opened and the mixture is unloaded into a concrete mixer truck or receiving hopper.
Chemical additives are dosed via the dispenser of chemical additives on 60 liters.
ZZBO is the official dealer of SICOMA concrete mixers in Russia and the CIS!
It is possible to supply a concrete plant with a concrete mixer from the manufacturer SICOMA.
One cycle lasts for 55-60 seconds , 1.5 cubic meters of the finished mixture are produced in one cycle.
- Capacity 90 cu m per hour
- It does not require foundation
- Twin-shaft concrete mixer for 2250 liters
- Software on our own SCADA system complete with a monoblock: accounting of material consumption and equipment operation, remote access and control over the work
- Transportation in two euro trailers or 40-foot containers
- Quick deployment and start-up - within one working day
Technical Features
- Capacity, cu m per hour 70...90
- Режим работы автомат по принципу "одна кнопка"
- Twin-shaft concrete mixer BP-2G-2250s
- Hoppers (number of x capacity, cu m) 3 x 18 = 54
- Silo capacity (optional), tons from 22
- Pneumatic equipment (Italy) CAMOZZI
- ABAC Pole Position L20P Compressor (Italy) Remeza
- Design summer
- Load of inert materials into the concrete mixer skip
- Total power, kW 95
- Sector gate, pneumatic control
- Weight, kg 25,000
- Height, mm 9010
- Width, mm 3,400
- Length, mm 17092
Quality
certificates
Products
in stock
Individual configuration
with prices for each item
Mobile
commissioning team
available
Worldwide
delivery
in trucks or containers
Call, hotline in Belarus
Our managers will answer all your questions from Monday till Friday:
from 06:00 a.m. to 05:00 p.m. (GMT+3, Moscow time)
Address: Republic of Belarus, 220073, g. Minsk, st. Olshevskogo, d. 20, room. 38a
e-mail: sales@zzbo.ru
Denis Zhilyakov
Director of the branch in the Republic of Belarus
Phone: +7 (951) 230-90-16
e-mail: sales@zzbo.ru
Place your order
We will send you the price,
conditions and terms of delivery
Response within 1 hour
You will get the offer with
individual delivery and payment conditions