Score

Filter:

Showing 1–300 of 737 results

561 173 BYN

including VAT 20%
  • Bitumen melting capacity, t/h 6
  • Daily bitumen melting capacity, m3/day up to 120
  • Bitumen shipment capacity, m3/h 25-30
  • Installed power consumption no more than, kW 40
  • Installed thermal power, kW 500
  • Natural gas consumption, nm.cub/h 69
  • Natural gas connection pressure, kPa 4-36

55 632 BYN

including VAT 20%
  • The highest limit of the cement dosing (NAP), kg 900
  • The highest limit of the water metering (NAP), kg 450
  • The greatest limit of dispensing chemical additives (NAP), kg 60
  • Dosing accuracy% ±1
  • Maximum discharge time, sec 20
  • The pressure in the pneumatic system, MPa no less 0,6
  • Product particle size, mm max 2

48 978 BYN

including VAT 20%
  • conveyor length, mm 11,300
  • The width of the conveyor belt, mm 800
  • Installed power, kW 18,5
  • Belt speed, m s 2
  • Productivity, tons hour 100
  • Тип ленты: shevronnaya
  • Угол установки конвейера, ° 27

690 BYN

including VAT 20%
  • Толщина листов, мм 0,7
  • Длина одной секции, мм 1,000
  • Material Оцинкованная сталь
  • Length, mm 1050
  • Width, mm 1,100
  • Height, mm 700

26 948 BYN

including VAT 20%
  • Thermal power, kW 100
  • Расход воздуха на выходе до, м3/hour 5000-7000
  • Давление воздуха на выходе из ТГВ не более, Па 900-1100
  • Дельта по нагреву воздуха, °С 40
  • Максимальная температура воздуха на выходе, °С 80
  • Время выхода на рабочий режим, не более, мин 7
  • Давление газа для теплогенератора, мбар индивидуально

34 282 BYN

including VAT 20%
  • Thermal power, kW 150
  • Расход воздуха на выходе до, м3/hour 5000-7000
  • Давление воздуха на выходе из ТГВ не более, Па 900-1100
  • Дельта по нагреву воздуха, °С 60
  • Максимальная температура воздуха на выходе, °С 100
  • Время выхода на рабочий режим, не более, мин 7
  • Давление газа для теплогенератора, мбар индивидуально
  • Thermal power, kW 250
  • Расход воздуха на выходе до, м3//час 7000-14000
  • Давление воздуха на выходе из ТГВ не более, Па 500-1500
  • Дельта по нагреву воздуха, °С 50
  • Максимальная температура воздуха на выходе, °С 90
  • Время выхода на рабочий режим, не более, мин 7
  • Давление газа для теплогенератора, мбар индивидуально

68 231 BYN

including VAT 20%
  • Thermal power, kW 250
  • Расход воздуха на выходе до, м3/час (с учетом расширения воздуха при максимальной дельте нагрева) 5,300
  • Расход воздуха вентилятора, м3/hour 2800
  • Дельта по нагреву воздуха, °С 210
  • Давление воздуха на выходе из ТГВ не более, Па 11500
  • Максимальная температура воздуха на выходе, °С 170
  • Время выхода на рабочий режим, не более, мин 7
  • Thermal power, kW 250
  • Расход воздуха на выходе до, м3/hour 8500-18000
  • Давление воздуха на выходе из ТГВ не более, Па 500-1000
  • Дельта по нагреву воздуха, °С 40
  • Максимальная температура воздуха на выходе, °С 80
  • Время выхода на рабочий режим, не более, мин 10
  • Давление газа для теплогенератора, мбар индивидуально
  • Thermal power, kW 250
  • Расход воздуха на выходе до, м3/hour 8500-18000
  • Давление воздуха на выходе из ТГВ не более, Па 500-1000
  • Дельта по нагреву воздуха, °С 40
  • Максимальная температура воздуха на выходе, °С 80
  • Время выхода на рабочий режим, не более, мин 10
  • Давление газа для теплогенератора, мбар индивидуально
  • Thermal power, kW 300
  • Расход воздуха на выходе ТГВ, м3/hour 10000-20000
  • Напор на выходе из установки, Па 50
  • The pressure fan Pa 200
  • Температура воздуха на выходе не более, °С 90
  • Время выхода на рабочий режим, не более, мин 15
  • Расход газа макс., нм3/hour 8..35

88 164 BYN

including VAT 20%
  • Thermal power, kW 250
  • Расход воздуха на выходе до, м3/час (с учетом расширения воздуха при максимальной дельте нагрева) 5,300
  • Расход воздуха вентилятора, м3/hour 2800
  • Дельта по нагреву воздуха, °С 210
  • Давление воздуха на выходе из ТГВ не более, Па 11500
  • Максимальная температура воздуха на выходе, °С 170
  • Время выхода на рабочий режим, не более, мин 7
  • Thermal power, kW 450
  • Расход воздуха на выходе до, м3/hour 14400-41000
  • Давление воздуха на выходе из ТГВ не более, Па 750-1130
  • Дельта по нагреву воздуха, °С 40
  • Максимальная температура воздуха на выходе, °С 70
  • Время выхода на рабочий режим, не более, мин 7
  • Давление газа для теплогенератора, мбар индивидуально
  • Тепловая мощность, МВт (Гкал) 0,2 (0,17)
  • Производительность ГВС (+5/+65), м3/hour 0,5
  • Температура теплоносителя на котловом контуре, °С +105/+90
  • Температура теплоносителя на внешнем отопительном контуре, °С +95/+70
  • Объѐм теплоносителя, л (не более, с учѐтом расширительных баков) 1,000
  • Расход топлива для газовой комплектации, нм.куб/час 24
  • Расход топлива для дизельной комплектации, кг/час 19

1 101 192 BYN

including VAT 20%
  • Установленная тепловая мощность, МВт (Гкал) 3,1 (2,66)
  • Паспортный КПД, % 90
  • Паспортный расход топлива: min/max, нм.куб/час 50/367
  • Установленные паровые котлы КПСД-2000х2
  • Установленные газовые горелки Baltur TBG 210P
  • Установленные газовые рампы ММ420
  • Водоподготовка умягчения с корректировкой рН DIASEL

1 101 192 BYN

including VAT 20%
  • Установленная тепловая мощность, МВт (Гкал) 3,1 (2,66)
  • Паспортный КПД, % 90
  • Паспортный расход топлива: min/max, нм.куб/час 50/367
  • Установленные паровые котлы КПСД-2000х2
  • Установленные газовые горелки Baltur TBG 210P
  • Установленные газовые рампы ММ420
  • Водоподготовка умягчения с корректировкой рН DIASEL
  • Тепловая мощность, МВт (Гкал) 0,174(0,15)
  • Температурный график (подача/обратка), °С 300/250
  • Установленный термомасляный котёл КТМ-0,15
  • Установленная горелка Baltur BТG 20P
  • Вид проектного топлива Природный газ ГОСТ 5542-2022
  • Паспортный расход газа: min/max, нм.куб/ч 10/24
  • Установленный фильтр топлива Тонкой очистки
  • Тепловая мощность, МВт (Гкал) 0,3(0,26)
  • Температурный график (подача/обратка), °С 300/250
  • Установленный термомасляный котёл КТМ-0,15 (2шт.)
  • Установленная горелка Baltur BТG 20P (2шт.)
  • Вид проектного топлива Природный газ ГОСТ 5542-2022
  • Гидравлические характеристики, МПа Термомасляная часть (подача/обратка) 0,3/0,05
  • Вместимость котельной по теплоносителю, м.куб 0.4
  • Тепловая мощность, МВт (Гкал) 0,65(0,56)
  • Температурный график (подача/обратка), °С 300/250
  • Установленный термомасляный котёл КТМ-0,65
  • Установленная горелка Еcoflam BLU 700.1LN PRE TL
  • Вид проектного топлива Природный газ ГОСТ 5542-2022
  • Паспортный расход газа: min/max, нм.куб/час 16/80
  • Установленный котёл КТМ-0,65
  • Тепловая мощность, МВт (Гкал) 0,8(0,69)
  • Температурный график (подача/обратка), °С 300/250
  • Установленный термомасляный котёл КТМ-1,0
  • Установленная горелка Baltur TBG 120 ME
  • Вид проектного топлива Природный газ ГОСТ 5542-2022
  • Гидравлические характеристики, МПа тепло масляная часть (подача/обратка) 0,25/0,05;
  • Вместимость котельной по теплоносителю, м.куб 1
  • Тепловая мощность, МВт (Гкал) 1,16(1,0)
  • Температурный график (подача/обратка), °С 300/250
  • Установленный термомасляный котёл КТМ-1,0
  • Установленная горелка Baltur TBG 150P
  • Вид проектного топлива Природный газ ГОСТ 5542-2022
  • Электропитание 3ф, 230/400В, 50Гц
  • Reject hopper capacity (at a density of 1.8 t/m³), m³ (t) Автоматическое
  • Тепловая мощность, МВт (Гкал) 3(2,58)
  • Температурный график (подача/обратка), °С 300/250
  • Установленный термомасляный котёл КТМ-1,5(2шт.)
  • Установленная горелка Baltur ТBML 200MC, Baltur ТBG 210P
  • Вид проектного топлива Природный газ ГОСТ 5542-2022
  • Паспортный расход газа по котельной: min/max, нм.куб/час 100/411
  • Низшая теплота сгорания проектного топлива, Ккал/нм.куб. 8,000
  • Thermal power, kW 450
  • Расход воздуха на выходе до, м3/hour 8700-18000
  • Давление воздуха на выходе из ТГВ не более, Па 500-1500
  • Дельта по нагреву воздуха, °С 70
  • Максимальная температура воздуха на выходе, °С 110
  • Время выхода на рабочий режим, не более, мин 7
  • Давление газа для теплогенератора, мбар индивидуально

887 BYN

including VAT 20%
  • Толщина листов, мм 0,7
  • Длина одной секции, мм 1,000
  • Material Оцинкованная сталь
  • Length, mm 1050
  • Width, mm 1429
  • Height, mm 1015
  • Изготавливаем из металла по Вашему выбору Hardox, Magstrong, 10HSND or 09G2S
  • Термообработка или цементирование on request
  • Возможность изготовления сварная или цельнометаллическая

188 293 BYN

including VAT 20%
  • Productivity, m³/hour 10...20
  • single-shaft mixer BP-1G-500
  • Automatic operating mode по принципу "одна кнопка"
  • Volume of bunkers, m³ (2 х 12) = 24
  • Total power, kW 23
  • Weight, kg 6,200
  • Length, mm 7690

212 632 BYN

including VAT 20%
  • Capacity, cu m per hour 10...20
  • single-shaft mixer BP-1G-500
  • Automatic operating mode по принципу "одна кнопка"
  • Volume of bunkers, m³ (3 х 12) = 36
  • Total power, kW 23
  • Sector gate, pneumatic control
  • Weight, kg 7,800

199 935 BYN

including VAT 20%
  • Масса, кг (включая тяговое устройство) 2050
  • Объем бадьи (полный/рабочий), м 2,05 / 1,5
  • Электропитание троллейное
  • Скорость передвижения бетоновоза, м/мин 80
  • Length, mm 4415
  • Width, mm 1,650
  • Height, mm 1665

9 971 BYN

including VAT 20%

19 942 BYN

including VAT 20%

246 323 BYN

including VAT 20%
  • Capacity, cu m per hour 10...20
  • single-shaft mixer BP-1G-500
  • Automatic operating mode по принципу "одна кнопка"
  • Volume of bunkers, m³ (4 х 12) = 48
  • Total power, kW 27
  • Sector gate, pneumatic control
  • Weight, kg 9330

134 665 BYN

including VAT 20%
  • Productivity, t / h 100
  • Lifting height, m 14
  • Number of buckets, pcs 70
  • Bucket pitch, mm 400
  • Bucket volume, l 8
  • Electric motor power, kW 11
  • Rotation frequency of the drive shaft, rpm 52

93 691 BYN

including VAT 20%
  • Useful volume of container, m3 45
  • Nominal capacity volume, m3 48
  • Heating area, m2 30
  • Oil registers, quantity, pcs 2
  • Coolant volume in registers, l 350
  • Ventilation system hatch ⌀600 mm and round deflector DN = 250 mm
  • Thermal insulation URSA basalt, mm 100

54 848 BYN

including VAT 20%
  • Useful volume of container, m3 30
  • Nominal capacity volume, m3 31
  • Oil registers, quantity, pcs 2
  • Coolant volume in registers, l 250
  • Ventilation system hatch ⌀600 mm and round deflector DN = 250 mm
  • Thermal insulation URSA basalt, mm Reject hopper capacity (at a density of 1.8 t/m³), m³ (t)
  • housing material steel St.09G2S sheet, s=4 mm of the shell, s=6 mm of the bottom

164 235 BYN

including VAT 20%
  • Heat production of the boiler, Gcal/h; 00.3
  • Bitumen pump performance, cube m; 15,7
  • Maximum oil temperature, ° C +300/+250
  • Operation temperature +5 ...+40 ° C
  • Useful volume of bitumen storage, cube. m 28
  • The volume of the coolant in the installation, cube. m 0,7
  • Thermal insulation URSA basalt, mm 50

44 680 BYN

including VAT 20%
  • Productivity, m 2
  • Productivity, m 2
  • Productivity, m Side, top
  • Side, top
  • Side, top2 44
  • Side, top2 10
  • Upper tier, m2 34

58 063 BYN

including VAT 20%
  • Productivity, m 1
  • Reject hopper capacity (at a density of 1.8 t/m³), m³ (t) 0,1
  • Installed power, kW 120
  • 23 866 $ Reject hopper capacity (at a density of 1.8 t/m³), m³ (t)
  • Reject hopper capacity (at a density of 1.8 t/m³), m³ (t) Reject hopper capacity (at a density of 1.8 t/m³), m³ (t)
  • Maximum oil heating temperature, °C 23 866 $
  • The volume of the coolant m3 0.8

512 480 BYN

including VAT 20%
  • Productivity, tons hour 20
  • Количество и объем бункеров, кол-во х м. куб 3 x 8
  • Weighing range of inert, kg 2,000
  • Asphalt-shaft, l 750
  • Total electric power of the plant, kW 110
  • Smoke exhauster power, kW 15
  • The volume of the hopper ready asphalt, tons 8

1 368 065 BYN

including VAT 20%
  • plant performance 80 t / h (3% moisture material)
  • Supply hopper with inert materials, count and volume. 5 bins of 8 m3
  • The thermal power of the burner 6500 kW
  • Number screening sieves 5
  • The volume of hot material hopper 14 м³
  • Weight one batch 1,000 kg
  • Total electric power of the plant, kW 230

79 309 BYN

including VAT 20%
  • Filtration plants 1,200
  • Filtration plants 3,000
  • Filtration plants 14
  • Number of tiers of screening surfaces, pcs 5
  • Number of tiers of screening surfaces, pcs Number of tiers of screening surfaces, pcs
  • Number of tiers of screening surfaces, pcs Number of tiers of screening surfaces, pcs 1,000
  • Number of tiers of screening surfaces, pcs 100

90 773 BYN

including VAT 20%
  • Number of tiers of screening surfaces, pcs3 14
  • Number of pneumatic cylinders, pcs. 5
  • Number of pneumatic cylinders, pcs.3 7
  • Number of pneumatic cylinders, pcs.3 Number of pneumatic cylinders, pcs.
  • Number of pneumatic cylinders, pcs.3 1,6
  • Number of pneumatic cylinders, pcs.3 1,6
  • Number of pneumatic cylinders, pcs.3 2,1

181 067 BYN

including VAT 20%
  • Number of pneumatic cylinders, pcs. 1,000
  • The volume of the batcher of hot inert materials, m3 The volume of the batcher of hot inert materials, m
  • The volume of the batcher of hot inert materials, m3 0The volume of the batcher of hot inert materials, m
  • The volume of the batcher of hot inert materials, m3 0,35
  • The volume of the batcher of hot inert materials, m The volume of the batcher of hot inert materials, m
  • Load cells for weighing mineral powder and dust, pcs x kg Load cells for weighing mineral powder and dust, pcs x kg
  • The volume of the batcher of hot inert materials, m Load cells for weighing mineral powder and dust, pcs x kg

43 057 BYN

including VAT 20%
  • Drive power, kW 7.5
  • Load cells for weighing mineral powder and dust, pcs x kg 75
  • Load cells for weighing mineral powder and dust, pcs x kg 1,5
  • Load cells for weighing mineral powder and dust, pcs x kg 600
  • Load cells for weighing mineral powder and dust, pcs x kg O Load cells for weighing mineral powder and dust, pcs x kg

195 284 BYN

including VAT 20%
  • End product capacity, t/h 80
  • End product capacity, t/h 3
  • End product capacity, t/h 7.5
  • End product capacity, t/h 4
  • Load cells for weighing mineral powder and dust, pcs x kg 11
  • End product capacity, t/h End product capacity, t/h
  • Operating thermal power of the burner, MW Operating thermal power of the burner, MW

30 233 BYN

including VAT 20%
  • Operating thermal power of the burner, MW3 8
  • Operating thermal power of the burner, MW 2,2
  • Operating thermal power of the burner, MW Operating thermal power of the burner, MW
  • Operating thermal power of the burner, MW 500
  • Vibrator power, kW 0Vibrator power, kW

200 690 BYN

including VAT 20%
  • Capacity, cu m per hour 10...20
  • single-shaft mixer BP-1G-500S
  • Automatic operating mode по принципу "одна кнопка"
  • Volume of bunkers, m³ (2 х 12) = 24
  • Total power, kW 23
  • Sector gate, pneumatic control
  • Length, mm 10200

39 885 BYN

including VAT 20%
  • Length, mm Maximum productivity of the belt feeder, t/h
  • Width, mm Maximum productivity of the belt feeder, t/h
  • Height, mm Maximum productivity of the belt feeder, t/h
  • Weight, t 2,7

55 482 BYN

including VAT 20%
  • Maximum productivity of the belt feeder, t/h Maximum productivity of the belt feeder, t/h
  • A type Maximum productivity of the belt feeder, t/h
  • Construction type Construction type
  • Construction type 85
  • Construction type3 1,500
  • Construction type O from “Bulgaria" 200
  • Productivity (at a flow rate in the cylindrical part of 2.5 m/s), mOProductivity (at a flow rate in the cylindrical part of 2.5 m/s), m Productivity (at a flow rate in the cylindrical part of 2.5 m/s), m

60 484 BYN

including VAT 20%
  • A type Скруббер "Вентури"
  • Construction type 96
  • Productivity (at a flow rate in the cylindrical part of 2.5 m/s), m3Productivity (at a flow rate in the cylindrical part of 2.5 m/s), m Productivity (at a flow rate in the cylindrical part of 2.5 m/s), m
  • Productivity (at a flow rate in the cylindrical part of 2.5 m/s), m3Productivity (at a flow rate in the cylindrical part of 2.5 m/s), m 30
  • Supply Pump Parameters:
  • Supply Pump Parameters: 4
  • Supply Pump Parameters:3Productivity (at a flow rate in the cylindrical part of 2.5 m/s), m Supply Pump Parameters:

223 649 BYN

including VAT 20%
  • Filtration area, m² 430
  • Supply Pump Parameters:3Productivity (at a flow rate in the cylindrical part of 2.5 m/s), m Supply Pump Parameters:
  • Supply Pump Parameters: 384
  • Filter cloth material for sleeves Filter cloth material for sleeves
  • Filter cloth material for sleeves O from “Bulgaria" Filter cloth material for sleeves
  • Filter cloth material for sleeves O from “Bulgaria" Filter cloth material for sleeves
  • Number of cleaning mechanisms, pcs 3

32 518 BYN

including VAT 20%
  • Filter cloth material for sleeves3 1,57
  • Dispenser volume, dm3 23
  • Dispenser volume, dm3Productivity (at a flow rate in the cylindrical part of 2.5 m/s), m Dispenser volume, dm
  • Dispenser volume, dm 90
  • Dispenser volume, dm Dispenser volume, dm
  • Dispenser volume, dm Dispenser volume, dm
  • Dispenser volume, dm Dispenser volume, dm

3 396 077 BYN

3 137 935 BYN

- discount -8%
including VAT 20%
  • Plant productivity, t/h 160 (3% moisture content of materials)
  • Feed hoppers with inert materials, quantity, volume 6 bunkers of 10m³
  • Thermal power of the burner, MW 14
  • Number of screen sieves, pcs 6
  • Hot materials hopper volume, m³ 22
  • Weight of one batch, kg 2,000
  • Dryer drum drive power, m² 4 x 11

42 883 BYN

including VAT 20%
  • Productivity, m3Productivity (at a flow rate in the cylindrical part of 2.5 m/s), m Productivity, m
  • Productivity, m Productivity, m
  • Drive power, kW 55
  • Productivity, m 1450
  • Productivity, m 16

233 175 BYN

including VAT 20%
  • Side, top Side, top
  • Side, top Side, top
  • Skip capacity (at a density of 1.8 t/m³), m³ (t) 0Skip capacity (at a density of 1.8 t/m³), m³ (t)
  • Skip capacity (at a density of 1.8 t/m³), m³ (t) Skip capacity (at a density of 1.8 t/m³), m³ (t)
  • Skip capacity (at a density of 1.8 t/m³), m³ (t) 1,3
  • Skip capacity (at a density of 1.8 t/m³), m³ (t) 2
  • Reject hopper capacity (at a density of 1.8 t/m³), m³ (t) Reject hopper capacity (at a density of 1.8 t/m³), m³ (t)

225 029 BYN

including VAT 20%
  • Capacity, cu m per hour 10...20
  • single-shaft mixer BP-1G-500S
  • Automatic operating mode по принципу "одна кнопка"
  • Volume of bunkers, m³ (3 x 8) = 24
  • Total power, kW 23
  • Sector gate, pneumatic control
  • Length, mm 13200

222 195 BYN

including VAT 20%
  • Number of sections, pcs 3
  • Total capacity (at a density of 1.8 t/m³), m³ (t) 28 (50)
  • The capacity of the sections of the finished mixture (at a density of 1.8 t/m³), m³ (t) 12 (21.5)
  • The capacity of the marriage section (at a density of 1.8 t/m³), m³ (t) 4 (7)

13 284 BYN

including VAT 20%
  • Splitting force, tons until 10
  • The size of the working zone, mm 410 x 570
  • Pegs height, mm 280
  • Hydraulic pressure, MPa 9...16
  • Total installed power, kW 2,2
  • Supply voltage, V/Hz 380/50
  • Weight, kg 325

17 441 BYN

including VAT 20%
  • Splitting force, tons 20
  • The size of the working zone, mm 410 x 570
  • Pegs height, mm 280
  • Hydraulic pressure, MPa 9...21
  • Total installed power, kW 5.5
  • Supply voltage, V/Hz 380/50
  • Weight, kg 505

31 973 BYN

including VAT 20%
  • Splitting force, tons 60
  • The size of the working zone, mm 820 x 570
  • Pegs height, mm 500
  • Hydraulic pressure, MPa 9...21
  • Total installed power, kW 7.5
  • Supply voltage, V/Hz 380/50
  • Weight, kg 950

32 222 BYN

including VAT 20%
  • Splitting force, tons 80
  • The size of the working zone, mm 820 x 570
  • Pegs height, mm 500
  • Hydraulic pressure, MPa 9...21
  • Total installed power, kW 7.5
  • Supply voltage, V/Hz 380/50
  • Weight, kg 1,000

36 445 BYN

including VAT 20%
  • Splitting force, tons 80
  • The size of the working zone, mm 1230 x 570
  • Pegs height, mm 500
  • Hydraulic pressure, MPa 9...21
  • Total installed power, kW 7.5
  • Supply voltage, V/Hz 380/50
  • Weight, kg 1190

37 623 BYN

including VAT 20%
  • The size of the molding zone, mm x mm 400 x 600
  • The height of the molding zone, mm 50...200
  • Performance of masonry 390h190h188, pieces per hour 120...225
  • Performance on a pavement slab 100h200, pieces per hour 400...750
  • molding cycle s 50...90
  • The number of moldings per hour piece. 40…75
  • Power vibration table, kW 5.5

258 720 BYN

including VAT 20%
  • Capacity, cu m per hour 10...20
  • single-shaft mixer BP-1G-500S
  • Automatic operating mode по принципу "одна кнопка"
  • Volume of bunkers, m³ (4 х 12) = 48
  • Total power, kW 27
  • Sector gate, pneumatic control
  • Length, mm 16200

7 691 BYN

including VAT 20%
  • Width, mm 2882,3
  • Length, mm 1808
  • Height, mm 209
  • Weight, kg 456,8-486,9
  • Characteristics of concrete products
  • Length, mm 1030-1550
  • Width, mm 120

11 168 BYN

including VAT 20%
  • Width, mm 3358,3
  • Length, mm 1803,6
  • Height, mm 379,7
  • Weight, kg 952,4-982,9
  • Characteristics of concrete products
  • Length, mm 1030-2980
  • Width, mm 120

14 893 BYN

including VAT 20%
  • Width, mm 4236,3
  • Length, mm 1515,6
  • Height, mm 479,7
  • Weight, kg 1311,9-1352,2
  • Characteristics of concrete products
  • Length, mm 1030-2980
  • Width, mm 120

11 717 BYN

including VAT 20%
  • Width, mm 3976,3
  • Length, mm 1525,6
  • Height, mm 497,7
  • Weight, kg 966,5-987,8
  • Characteristics of concrete products
  • Length, mm 1810-3630
  • Width, mm 250

12 467 BYN

including VAT 20%
  • Width, mm 3326,3
  • Length, mm 1515,6
  • Height, mm 449,7
  • Weight, kg 961,2-995,9
  • Characteristics of concrete products
  • Length, mm 1290-2980
  • Width, mm 120

6 719 BYN

including VAT 20%
  • Length, mm 2552
  • Height, mm 580
  • Weight, kg 570
  • Length, mm 2,600
  • Width, mm 570
  • Height, mm 665
  • Weight, kg 328
  • Thickness 8
  • Length, mm 2,600
  • Width, mm 670
  • Height, mm 665
  • Weight, kg 342
  • Thickness 8
  • Length, mm 2,600
  • Width, mm 770
  • Height, mm 665
  • Weight, kg 356
  • Thickness 8
  • Length, mm 2,600
  • Width, mm 870
  • Height, mm 665
  • Weight, kg 371
  • Metal Thickness 8

202 975 BYN

including VAT 20%
  • Capacity, cu m per hour 10...20
  • single-shaft mixer BP-1G-500s
  • Automatic operating mode по принципу "одна кнопка"
  • Volume of bunkers, m³ (2 х 12) = 24
  • Total power, kW 23
  • Sector gate, pneumatic control
  • Height, mm 10460

3 927 BYN

including VAT 20%
  • Length, mm 3138
  • Width, mm 611
  • Height, mm 485
  • Weight, kg 335
  • Wall thickness, mm 4

4 289 BYN

including VAT 20%
  • Diameter, mm 840
  • Height, mm 1145
  • Weight, kg 308
  • Thickness 6

5 218 BYN

including VAT 20%
  • Diameter, mm 1160
  • Height, mm 1290
  • Weight, kg 439
  • Thickness 6

65 692 BYN

including VAT 20%
  • Size of products KS7, KS10, KS13, COP15, KS20
  • The disturbing force, kN 40
  • Power vibration table, kW 4
  • different frequency vibration option
  • Installed power, kW 8,4
  • the molding cycle time, s 60..180
  • The number of moldings per hour, pieces 7...15

7 733 BYN

including VAT 20%
  • Diameter, mm 1680
  • Height, mm 1344
  • Weight, kg 650
  • Metal Thickness 6

227 314 BYN

including VAT 20%
  • Capacity, cu m per hour 10...20
  • single-shaft mixer BP-1G-500S
  • Automatic operating mode по принципу "одна кнопка"
  • Volume of bunkers, m³ (3 х 12) = 36
  • Total power, kW 23
  • Sector gate, pneumatic control
  • Length, mm 13500

10 619 BYN

including VAT 20%
  • Diameter, mm 2,200
  • Height, mm 1350
  • Weight, kg 882
  • Metal Thickness 6

732 BYN

including VAT 20%
  • Diameter, mm 840
  • Height, mm 150
  • Weight, kg 62
  • Diameter, mm 1160
  • Height, mm 150
  • Weight, kg 92
  • Diameter, mm 1680
  • Height, mm 150
  • Weight, kg 118

117 322 BYN

including VAT 20%
  • Size of products KS7, KS10, KS13, COP15, KS20
  • The disturbing force, kN 64
  • Power vibration table, kW 6,4
  • different frequency vibration option
  • Installed power, kW 10,4
  • the molding cycle time, s 60...180
  • The number of moldings per hour, pieces 7...15

58 452 BYN

including VAT 20%
  • Productivity, t/hour 20
  • Hopper loading volume, m³ 1 – 3 (depending on configuration)
  • Supply voltage, V/Hz Reject hopper capacity (at a density of 1.8 t/m³), m³ (t)
  • Installed power, kW 6,2
  • Conveyor drive power, kW 2,2
  • Spreader drive power, kW 2,2
  • Vibrator drive power, kW 0Vibrator power, kW
  • Diameter, mm 2,200
  • Height, mm 150
  • Weight, kg 144

3 838 BYN

including VAT 20%

261 005 BYN

including VAT 20%
  • Capacity, cu m per hour 10...20
  • single-shaft mixer BP-1G-500S
  • Automatic operating mode по принципу "одна кнопка"
  • Volume of bunkers, m³ (4 х 12) = 48
  • Total power, kW 27
  • Sector gate, pneumatic control
  • Length, mm 16500
  • Grate in hopper section
  • Grate in hopper section

6 170 BYN

including VAT 20%
  • Grate in hopper section
  • Grate in hopper section

8 451 BYN

including VAT 20%
  • Grate in hopper section
  • Grate in hopper section
  • Grate in hopper section

260 625 BYN

including VAT 20%
  • Capacity, cu m per hour 20...30
  • Twin-shaft concrete mixer BP-2G-750s
  • Automatic operating mode по принципу "одна кнопка"
  • Volume of bunkers, m³ (2 х 12) = 24
  • Total power, kW 23
  • Sector gate, pneumatic control
  • Height, mm 11500

284 964 BYN

including VAT 20%
  • Capacity, cu m per hour 20...30
  • Twin-shaft concrete mixer BP-2G-750S
  • Automatic operating mode по принципу "одна кнопка"
  • Volume of bunkers, m³ (3 х 12) = 24
  • Total power, kW 32
  • Sector gate, pneumatic control
  • Length, mm 14500
  • Grate in hopper section

80 342 BYN

including VAT 20%

121 437 BYN

including VAT 20%

170 781 BYN

including VAT 20%

189 156 BYN

including VAT 20%

280 328 BYN

including VAT 20%

308 876 BYN

including VAT 20%

318 655 BYN

including VAT 20%
  • Capacity, cu m per hour 20...30
  • Twin-shaft concrete mixer BP-2G-750S
  • Automatic operating mode по принципу "одна кнопка"
  • Volume of bunkers, m³ (4 х 12) = 48
  • Total power, kW 36
  • Sector gate, pneumatic control
  • Length, mm 17500

140 140 BYN

including VAT 20%

140 140 BYN

including VAT 20%

42 381 BYN

including VAT 20%
  • The total volume of bunkers, the cube. m. 10
  • The volume of the hopper, the cube. m. 5
  • The number of bins, pieces. 2
  • The maximum dose weighing kg to 1200
  • Batching error,% ±1
  • Belt speed, m c 1,3
  • The pressure in the pneumatic system, MPa 0,6
  • The total volume of bunkers, the cube. m. 12
  • The number of bins, pieces. 2
  • The volume of each bunker, cub. m. 84
  • The maximum dose weighing kg up to 1000
  • Batching error,% ±1
  • Belt speed, m c 0,9
  • The pressure in the pneumatic system, MPa 0,6...0,8

60 906 BYN

including VAT 20%
  • The total volume of bunkers, the cube. m. 16
  • The volume of the hopper, the cube. m. 8
  • The number of bins, pieces. 2
  • The maximum dose weighing kg to 1500
  • Batching error,% ±1
  • Belt speed, m c 1
  • The pressure in the pneumatic system, MPa 0,6

80 177 BYN

including VAT 20%
  • The total volume of bunkers, the cube. m. 24
  • The volume of the hopper, the cube. m. 8
  • The number of bins, pieces. 3
  • The maximum dose weighing kg to 2000
  • Batching error,% ±1
  • Belt speed, m c 1
  • The pressure in the pneumatic system, MPa 0,6

261 108 BYN

including VAT 20%
  • Capacity, cu m per hour 20...30
  • Twin-shaft concrete mixer BP-2G-750s
  • Automatic operating mode по принципу "одна кнопка"
  • Volume of bunkers, m³ (2 х 12) = 24
  • Total power, kW 32
  • Sector gate, pneumatic control
  • Height, mm 11900

105 492 BYN

including VAT 20%
  • Total volume of bunkers, m³ 32
  • Volume of one bunker, m³ 8
  • The number of bins, pieces. 4
  • The maximum dose weighing kg 14 910 $
  • Batching error,% ±1
  • Belt speed, m c 1
  • The pressure in the pneumatic system, MPa 0,6

83 082 BYN

including VAT 20%
  • The total volume of bunkers, the cube. m. 24
  • The volume of the hopper, the cube. m. 12
  • The number of bins, pieces. 2
  • Belt conveyor drive power, kW 7.5
  • The width of the conveyor belt, mm 800
  • The slope of the conveyor, ° 6
  • Belt speed, m/s 1,75

107 421 BYN

including VAT 20%
  • The total volume of bunkers, the cube. m. 36
  • The volume of the hopper, the cube. m. 12
  • The number of bins, pieces. 3
  • Belt conveyor drive power, kW 7.5
  • The width of the conveyor belt, mm 800
  • The slope of the conveyor, ° 6
  • Belt speed, m/s 1,75

141 112 BYN

including VAT 20%
  • Total volume of bunkers, m³ 48
  • Volume of one bunker, m³ 12
  • The number of bins, pieces. 4
  • Belt conveyor drive power, kW 11
  • The width of the conveyor belt, mm 800
  • Conveyor inclination angle, ° 4,5
  • Belt speed, m/s 1,3

194 412 BYN

including VAT 20%
  • Vibrator power, kW 5
  • Vibrator power, kW 8
  • Vibrator power, kW 2,2
  • Vibrator power, kW 500
  • Maximum productivity of the belt feeder, t/h Operating thermal power of the burner, MW
  • Maximum productivity of the belt feeder, t/h 0Vibrator power, kW
  • Maximum productivity of the belt feeder, t/h 7.5

106 440 BYN

including VAT 20%
  • Total volume of bunkers, m³ 40
  • Volume of one bunker, m³ 20
  • Vibrator power, kW 2
  • The maximum dose weighing kg 14 910 $
  • Batching error,% ±1
  • Belt speed, m c 1,9
  • The pressure in the pneumatic system, MPa 0,6...0,8

134 787 BYN

including VAT 20%
  • The total volume of bunkers, the cube. m. 60
  • The volume of the hopper, the cube. m. 20
  • The number of bins, pieces. 3
  • The maximum dose weighing kg up to 4500
  • Batching error,% ±1
  • Belt speed, m c 1,9
  • The pressure in the pneumatic system, MPa 0,6...0,8

175 131 BYN

including VAT 20%
  • Total volume of bunkers, m³ 80
  • Volume of one bunker, m³ 20
  • Vibrator power, kW 4
  • The maximum dose weighing kg 6000
  • Batching error,% ±1
  • Belt speed, m c 1,9
  • The pressure in the pneumatic system, MPa 0,6...0,8

257 612 BYN

including VAT 20%
  • Total volume of bunkers, m³ 120
  • Volume of one bunker, m³ 30
  • Vibrator power, kW 4
  • Batching error,% ±1
  • Belt speed, m/s 1,4
  • The pressure in the pneumatic system, MPa 0,6...0,8
  • Aggregate size, mm max 70

108 808 BYN

including VAT 20%
  • The total maximum amount of bunkers, the cube. m. 24
  • The volume of the hopper, the cube. m. 12
  • The number of bins, pieces. 2
  • The maximum dose weighing kg 1500 kg
  • Batching error,% 1
  • Belt speed, m c 1,6
  • The pressure in the pneumatic system, MPa 0,6...0,8

285 447 BYN

including VAT 20%
  • Capacity, cu m per hour 20...30
  • Twin-shaft concrete mixer BP-2G-750s
  • Automatic operating mode по принципу "одна кнопка"
  • Volume of bunkers, m³ (3 х 12) = 36
  • Total power, kW 32
  • Length, mm 14900
  • Width, mm 3421

8 601 BYN

including VAT 20%
  • conveyor length, mm 3,000
  • The width of the conveyor belt, mm 500
  • Installed power, kW 2,2
  • Belt speed, m s 0,58
  • Productivity, tons hour 55
  • Type of tape smooth
  • conveyor installation angle, degrees 0...30

133 938 BYN

including VAT 20%
  • The total maximum amount of bunkers, the cube. m. 36
  • The volume of the hopper, the cube. m. 12
  • The number of bins, pieces. 3
  • The maximum dose weighing kg 2,500
  • Batching error,% 1
  • Belt speed, m c 1,6
  • The pressure in the pneumatic system, MPa 0,6...0,8

142 265 BYN

including VAT 20%
  • Total maximum volume of bunkers, m³ 54
  • Volume of one bunker, m³ 18
  • The number of bins, pieces. 3
  • The maximum dose weighing kg 3,000
  • Batching error,% 1
  • Belt speed, m c 1,6
  • The pressure in the pneumatic system, MPa 0,6...0,8

14 368 BYN

including VAT 20%
  • conveyor length, mm 7000
  • The width of the conveyor belt, mm 500
  • Installed power, kW 4
  • Belt speed, m s 0,78
  • Productivity, tons hour 55
  • Type of tape smooth
  • conveyor installation angle, degrees 0...30

11 088 BYN

including VAT 20%
  • conveyor length, mm 5,000
  • The width of the conveyor belt, mm 500
  • Installed power, kW 2,2
  • Belt speed, m s 0,58
  • Productivity, tons hour 55
  • Type of tape smooth
  • conveyor installation angle, degrees 0...30

15 785 BYN

including VAT 20%
  • conveyor length, mm 8,000
  • The width of the conveyor belt, mm 500
  • Installed power, kW 4
  • Belt speed, m s 0,58
  • Productivity, tons hour 55
  • Type of tape smooth
  • conveyor installation angle, degrees 0...30

19 288 BYN

including VAT 20%
  • conveyor length, mm 10,000
  • The width of the conveyor belt, mm 500
  • Installed power, kW 4
  • Belt speed, m s 0,58
  • Productivity, tons hour 55
  • Type of tape smooth
  • conveyor installation angle, degrees 0...30

319 138 BYN

including VAT 20%
  • Capacity, cu m per hour 20...30
  • Twin-shaft concrete mixer BP-2G-750S
  • Automatic operating mode по принципу "одна кнопка"
  • Volume of bunkers, m³ (4 х 12) = 48
  • Total power, kW 36
  • Sector gate, pneumatic control
  • Length, mm 17900
  • conveyor length, mm 18156
  • The width of the conveyor belt, mm 800
  • Installed power, kW 15
  • Belt speed, m s 1,67
  • Productivity, tons hour 100
  • Type of tape shevronnaya
  • conveyor installation angle, degrees 25
  • conveyor length, mm 17500
  • The width of the conveyor belt, mm 1,000
  • Installed power, kW 30
  • Belt speed, m s 2,46
  • Type of tape shevronnaya
  • Угол установки конвейера, ° 26
  • type of product friable

44 380 BYN

including VAT 20%
  • conveyor length, mm 15,000
  • The width of the conveyor belt, mm 800
  • Installed power, kW 15
  • Belt speed, m s 3,19
  • Productivity, tons hour 330
  • Type of tape shevronnaya
  • conveyor installation angle, degrees 25

29 444 BYN

including VAT 20%
  • conveyor length, mm 16,000
  • The width of the conveyor belt, mm 600
  • Installed power, kW 7.5
  • Belt speed, m s 0,92
  • Productivity, tons hour 75
  • Type of tape shevronnaya
  • conveyor installation angle, degrees 25

62 276 BYN

including VAT 20%
  • conveyor length, mm 17000
  • The width of the conveyor belt, mm 1,000
  • Installed power, kW 18,5
  • Belt speed, m s 2,2
  • Productivity, tons hour 75
  • Type of tape shevronnaya
  • conveyor installation angle, degrees 25

49 781 BYN

including VAT 20%
  • conveyor length, mm 18,000
  • The width of the conveyor belt, mm 800
  • Installed power, kW 15
  • Belt speed, m s 1,67
  • Productivity, tons hour 100
  • Type of tape shevronnaya
  • conveyor installation angle, degrees 25

39 472 BYN

including VAT 20%
  • The size of the molding zone, mm x mm 400 x 600
  • The height of the molding zone, mm 50...200
  • Performance of masonry 390h190h188, pieces per hour 120...240
  • Performance on a pavement slab 100h200, pieces per hour 400...800
  • molding cycle s 50...90
  • The number of moldings per hour piece. 40…80
  • Power vibration table, kW 5.5

68 752 BYN

including VAT 20%
  • conveyor length, mm 21000
  • The width of the conveyor belt, mm 1,000
  • Installed power, kW 18,5
  • Belt speed, m s 1,67
  • Productivity, tons hour 120
  • Type of tape shevronnaya
  • conveyor installation angle, degrees 25

53 117 BYN

including VAT 20%
  • The size of the molding zone, mm x mm 400 x 600
  • The height of the molding zone, mm 50...200
  • Performance of masonry 390h190h188, pieces per hour 132...270
  • Performance paving tiles 100h200, pcs h 420...900
  • molding cycle s 40...85
  • Power vibration table, kW 5.5
  • Total installed power, kW 9,5

58 752 BYN

including VAT 20%
  • The size of the molding zone, mm x mm 400 x 600
  • The height of the molding zone, mm 50...200
  • Performance of masonry 390h190h188, pieces per hour 135...270
  • Performance paving tiles 100h200, pcs h 450...900
  • molding cycle s 40...80
  • The number of moldings per hour piece. 45…90
  • Power vibration table, kW 5.5

61 080 BYN

including VAT 20%
  • The size of the molding zone, mm x mm 400 x 600
  • The height of the molding zone, mm 50...200
  • Performance of masonry 390h190h188, pieces per hour 216...360
  • Performance paving tiles 100h200, pcs h 720...1200
  • molding cycle 30...60
  • The number of moldings per hour piece. 72…120
  • Power vibration table, kW 5.5

68 062 BYN

including VAT 20%
  • The size of the molding zone, mm x mm 400 x 600
  • The height of the molding zone, mm 50...200
  • Performance of masonry 390h190h188, pieces per hour 216...360
  • Performance paving tiles 100h200, pcs h 720...1200
  • molding cycle s 30...50
  • The number of moldings per hour piece. 60…120
  • Power vibration table, kW 5.5

261 582 BYN

including VAT 20%
  • Capacity, cu m per hour 20...30
  • Twin-shaft concrete mixer BP-2G-750S
  • Automatic operating mode по принципу "одна кнопка"
  • Volume of bunkers, m³ (2 х 12) = 24
  • Total power, kW 32
  • Sector gate, pneumatic control
  • Length, mm 12520

81 641 BYN

including VAT 20%
  • The size of the molding zone, mm x mm 400 x 600
  • The height of the molding zone, mm 40...250
  • Performance of masonry 390h190h188, pieces per hour 135...270
  • Performance paving tiles 100h200, pcs h 450...900
  • molding cycle s 40...80
  • The number of moldings per hour piece. 45…90
  • Power vibration table, kW 5.5

83 584 BYN

including VAT 20%
  • The size of the molding zone, mm x mm 400 x 600
  • The height of the molding zone, mm 50...200
  • Performance of masonry 390h190h188, pieces per hour 135...270
  • Performance paving tiles 100h200, pcs h 450...900
  • molding cycle s 40...80
  • The number of moldings per hour piece. 45…90
  • Power vibration table, kW 5.5

128 888 BYN

including VAT 20%
  • The size of the molding zone, mm x mm 400 x 600
  • The height of the molding zone, mm 50...200
  • Performance of masonry 390h190h188, pieces per hour 135...270
  • Performance paving tiles 100h200, pcs h 450...900
  • molding cycle s 40...80
  • The number of moldings per hour piece. 45…90
  • Power vibration table, kW 5.5

74 082 BYN

including VAT 20%
  • The size of the molding zone, mm x mm 400 x 600
  • The height of the molding zone, mm 50...200
  • Performance of masonry 390h190h188, pieces per hour 216...360
  • Performance paving tiles 100h200, pcs h 720...1200
  • molding cycle s 30...50
  • The number of moldings per hour piece. 60…120
  • Power vibration table, kW 5.5

88 159 BYN

including VAT 20%
  • The size of the molding zone, mm x mm 400 x 600
  • The height of the molding zone, mm 50...200
  • Performance of masonry 390h190h188, pieces per hour 135...270
  • Performance paving tiles 100h200, pcs h 450...900
  • molding cycle s 40...80
  • The number of moldings per hour piece. 45…90
  • Power vibration table, kW 5.5

77 718 BYN

including VAT 20%
  • Vibropress uLTRA
  • LK 5-0,5 Belt Conveyor
  • BP-1G-300 Concrete Mixer
  • Performance of masonry 390h190h188, pieces per hour 240
  • Performance paving tiles 100h200, pcs h 800
  • Power vibration table, kW 5.5
  • Total installed power, kW 17,5

113 169 BYN

including VAT 20%
  • Vibropress uLTRA
  • BP-2G-375s Twin-shaft concrete mixer
  • Elevated structure
  • Performance of masonry 390h190h188, pieces per hour 240
  • Performance paving tiles 100h200, pcs h 800
  • Power vibration table, kW 5.5
  • Total installed power, kW 21,5

117 674 BYN

including VAT 20%
  • Vibropress uLTRA
  • BP-2G-375s Twin-shaft concrete mixer
  • LK 5-0,5 Belt Conveyor
  • Performance of masonry 390h190h188, pieces per hour 240
  • Performance paving tiles 100h200, pcs h 800
  • Power vibration table, kW 5.5
  • Total installed power, kW 23,7

198 522 BYN

including VAT 20%
  • Vibropress uLTRA
  • MOBIL-20 Concrete Plant
  • LK 5-0,5 Belt Conveyor
  • Performance of masonry 390h190h188, pieces per hour 240
  • Performance paving tiles 100h200, pcs h 800
  • Power vibration table, kW 5.5
  • Total installed power, kW 38,7

199 698 BYN

including VAT 20%
  • Vibropress uLTRA
  • Concrete plant COMPACT 20
  • Performance of masonry 390h190h188, pieces per hour 240
  • Performance paving tiles 100h200, pcs h 800
  • Power vibration table, kW 5.5
  • Total installed power, kW 37

285 921 BYN

including VAT 20%
  • Capacity, cu m per hour 20...30
  • Twin-shaft concrete mixer BP-2G-750S
  • Automatic operating mode по принципу "одна кнопка"
  • Working volume of bunkers, m³ (3 х 12) = 36
  • Total power, kW 32
  • Sector gate, pneumatic control
  • Length, mm 15520

107 590 BYN

including VAT 20%
  • The size of the molding zone, mm x mm 400 x 1000
  • The height of the molding zone, mm 120...200
  • Power vibration table, kW 2,2
  • Installed power, kW 9,2
  • The frequency of the vibrating table fluctuations, Hz 60
  • Hopper capacity, cu. m. 0,9
  • the molding cycle time, s 30…60

125 439 BYN

including VAT 20%
  • The size of the molding zone, mm x mm 400 x 1000
  • The height of the molding zone, mm 120...200
  • Power vibration table, kW 2,2
  • Installed power, kW 9,2
  • The frequency of the vibrating table fluctuations, Hz 60
  • Hopper capacity, cu. m. 0,9
  • the molding cycle time, s 30…60

118 748 BYN

including VAT 20%
  • The size of the molding zone, mm x mm 400 x 1000
  • The height of the molding zone, mm 50...200
  • molding cycle s 30...80
  • Power vibration table, kW 7.5
  • Installed power, kW 13
  • The frequency of the vibrating table fluctuations, Hz 45...85
  • Hydraulic pressure, MPa 6...12

128 860 BYN

including VAT 20%
  • The size of the molding zone, mm x mm 400 x 1000
  • The height of the molding zone, mm 50...200
  • molding cycle s 30...80
  • Power vibration table, kW 7.5
  • Installed power, kW 13
  • The frequency of the vibrating table fluctuations, Hz 45...85
  • Hydraulic pressure, MPa 6...12

154 452 BYN

including VAT 20%
  • The size of the molding zone, mm x mm 400 x 1000
  • The height of the molding zone, mm 50...200
  • molding cycle s 30...80
  • Power vibration table, kW 7.5
  • Installed power, kW 13
  • The frequency of the vibrating table fluctuations, Hz 45...85
  • Hydraulic pressure, MPa 6...12
  • STANDART Block Making Machine
  • BP-2G-375s Twin-shaft concrete mixer
  • Elevated structure
  • Power vibration table, kW 7.5
  • Installed power, kW 25
  • Performance of masonry 390h190h188, pieces per hour 500
  • Performance paving tiles 100h200, pcs h 1800
  • STANDART Block Making Machine
  • BP-2G-375s Twin-shaft concrete mixer
  • LK 5-0,5 Belt Conveyor
  • Power vibration table, kW 7.5
  • Installed power, kW 27,2
  • Performance of masonry 390h190h188, pieces per hour 500
  • Performance paving tiles 100h200, pcs h 1800

308 749 BYN

including VAT 20%
  • STANDART Block Making Machine
  • MOBIL-20 Concrete Plant
  • LK 5-0,5 Belt Conveyor
  • Power vibration table, kW 7.5
  • Installed power, kW 42,2
  • Performance of masonry 390h190h188, pieces per hour 500
  • Performance paving tiles 100h200, pcs h 1800

307 994 BYN

including VAT 20%
  • STANDART Block Making Machine
  • Concrete plant COMPACT 20
  • Power vibration table, kW 7.5
  • Installed power, kW 42,2
  • Performance of masonry 390h190h188, pieces per hour 500
  • Performance paving tiles 100h200, pcs h 1800

319 612 BYN

including VAT 20%
  • Capacity, cu m per hour 20...30
  • Twin-shaft concrete mixer BP-2G-750S
  • Automatic operating mode по принципу "одна кнопка"
  • Volume of bunkers, m³ (4 х 12) = 48
  • Total power, kW 32
  • Sector gate, pneumatic control
  • Length, mm 18600
  • Packaging pallet size, mm x mm 800x1200
  • Package height, mm 500-1600
  • Stretch film size - width, mm 500
  • Total installed power, kW 7
  • Performance Up to 500 pallets per shift
  • Packing speed Up to 30 seconds per pallet
  • Hydraulic pressure, MPa 6...12

160 791 BYN

including VAT 20%
  • The size of the molding zone, mm x mm 1000 x 600
  • The height of the molding zone, mm 50...300
  • molding cycle s 30...80
  • Power vibration table, kW 11
  • Total installed power, kW 16,5
  • The frequency of the vibrating table fluctuations, Hz 45...85
  • Hydraulic pressure, MPa 6...12

176 905 BYN

including VAT 20%
  • The size of the molding zone, mm x mm 1000 x 600
  • The height of the molding zone, mm 50...300
  • molding cycle s 30...80
  • Power vibration table, kW 11
  • Total installed power, kW 16,5
  • The frequency of the vibrating table fluctuations, Hz 45...85
  • Hydraulic pressure, MPa 6...12

462 525 BYN

including VAT 20%
  • The size of the molding zone, mm x mm 1200 × 800 мм
  • The height of the molding zone, mm 50...350
  • molding cycle s 30...80
  • Power vibration table, kW 22
  • Total installed power, kW 39,5
  • The frequency of the vibrating table fluctuations, Hz 45...85
  • Hydraulic pressure, MPa 4...12

203 810 BYN

including VAT 20%
  • The size of the molding zone, mm x mm 1000 x 600
  • The height of the molding zone, mm 50...300
  • molding cycle s 30...80
  • Power vibration table, kW 11
  • Installed power, kW 16,5
  • The frequency of the vibrating table fluctuations, Hz 45...85
  • Hydraulic pressure, MPa 6...12

215 602 BYN

including VAT 20%
  • The size of the molding zone, mm x mm 1000 x 600
  • The height of the molding zone, mm 50...300
  • molding cycle s 30...80
  • Power vibration table, kW 11
  • Total installed power, kW 16,5
  • The frequency of the vibrating table fluctuations, Hz 45...85
  • Hydraulic pressure, MPa 6...12

204 050 BYN

including VAT 20%
  • The size of the molding zone, mm x mm 1000 x 600
  • The height of the molding zone, mm 50...300
  • molding cycle s 30...80
  • Power vibration table, kW 11
  • Total installed power, kW 16,5
  • The frequency of the vibrating table fluctuations, Hz 45...85
  • Hydraulic pressure, MPa 6..12

261 939 BYN

including VAT 20%
  • The size of the molding zone, mm x mm 1000 x 600
  • The height of the molding zone, mm 50...300
  • molding cycle s 30...80
  • Power vibration table, kW 11
  • Total installed power, kW 16,5
  • The frequency of the vibrating table fluctuations, Hz 45...85
  • Hydraulic pressure, MPa 6..12

88 328 BYN

including VAT 20%
  • The size of the molding zone, mm x mm 800 x 400
  • The height of the molding zone, mm 50...250
  • molding cycle s 30...80
  • Power vibration table, kW 7.5
  • Installed power, kW 11,5
  • The frequency of the vibrating table fluctuations, Hz 45...85
  • Hydraulic pressure, MPa 6...12

256 491 BYN

including VAT 20%
  • The size of the molding zone, mm x mm 1000 x 600
  • The height of the molding zone, mm 50...300
  • molding cycle s 30...80
  • Power vibration table, kW 11
  • Total installed power, kW 16,5
  • The frequency of the vibrating table fluctuations, Hz 45...85
  • Hydraulic pressure, MPa 6..12

94 311 BYN

including VAT 20%
  • The size of the molding zone, mm x mm 800 x 400
  • The height of the molding zone, mm 50...250
  • molding cycle s 30...80
  • Power vibration table, kW 7.5
  • Installed power, kW 11,5
  • The frequency of the vibrating table fluctuations, Hz 45...85
  • Hydraulic pressure, MPa 6...12

316 534 BYN

including VAT 20%
  • The size of the molding zone, mm x mm 1000 x 600
  • The height of the molding zone, mm 50...300
  • molding cycle s 30...80
  • Power vibration table, kW 11
  • Total installed power, kW 16,5
  • The frequency of the vibrating table fluctuations, Hz 45...85
  • Hydraulic pressure, MPa 6..12

97 084 BYN

including VAT 20%
  • The size of the molding zone, mm x mm 800 x 400
  • The height of the molding zone, mm 50...250
  • molding cycle s 30...80
  • Power vibration table, kW 7.5
  • Installed power, kW 11,5
  • The frequency of the vibrating table fluctuations, Hz 45...85
  • Hydraulic pressure, MPa 6...12

106 600 BYN

including VAT 20%
  • The size of the molding zone, mm x mm 800 x 400
  • The height of the molding zone, mm 50...250
  • molding cycle s 30...80
  • Power vibration table, kW 7.5
  • Installed power, kW 11,5
  • The frequency of the vibrating table fluctuations, Hz 45...85
  • Hydraulic pressure, MPa 6...12

129 616 BYN

including VAT 20%
  • The size of the molding zone, mm x mm 800 x 400
  • The height of the molding zone, mm 50...250
  • molding cycle s 30...80
  • Power vibration table, kW 7.5
  • Installed power, kW 11,5
  • The frequency of the vibrating table fluctuations, Hz 45...85
  • Hydraulic pressure, MPa 6...12

119 813 BYN

including VAT 20%
  • The size of the molding zone, mm x mm 800 x 400
  • The height of the molding zone, mm 50...250
  • molding cycle s 30...80
  • Power vibration table, kW 7.5
  • Installed power, kW 11,5
  • The frequency of the vibrating table fluctuations, Hz 45...85
  • Hydraulic pressure, MPa 6...12

132 112 BYN

including VAT 20%
  • The size of the molding zone, mm x mm 800 x 400
  • The height of the molding zone, mm 50...250
  • molding cycle s 30...80
  • Power vibration table, kW 7.5
  • Installed power, kW 11,5
  • The frequency of the vibrating table fluctuations, Hz 45...85
  • Hydraulic pressure, MPa 6...12

133 454 BYN

including VAT 20%
  • Vibropress Optimal 2.0
  • BP-1G-300 Concrete Mixer
  • Belt conveyor LK 6-0.5
  • Power vibration table, kW 7.5
  • Installed power, kW 11,5
  • Performance of masonry 390h190h188, pieces per hour 400
  • Performance paving tiles 100h200, pcs h 1400

167 154 BYN

including VAT 20%
  • Vibropress Optimal 2.0
  • Concrete plant Mini RBU-10
  • Power vibration table, kW 7.5
  • Installed power, kW 21,5
  • Performance of masonry 390h190h188, pieces per hour 400
  • Performance paving tiles 100h200, pcs h 1400
  • Length, mm
  • Vibropress Optimal
  • BP-1G-300 Concrete Mixer
  • BP-1G-100 Concrete Mixer
  • Power vibration table, kW 7.5
  • Installed power, kW 23,6
  • Performance of masonry 390h190h188, pieces per hour 400
  • Performance paving tiles 100h200, pcs h 1400

424 748 BYN

including VAT 20%
  • The size of the molding zone, mm x mm 1000 x 600
  • The height of the molding zone, mm 50...300
  • molding cycle s 22-60
  • Power vibration table, kW 11
  • Total installed power, kW 36
  • The frequency of the vibrating table fluctuations, Hz 45...85
  • Hydraulic pressure, MPa 6...12

471 019 BYN

including VAT 20%
  • The size of the molding zone, mm x mm 1000 x 600
  • The height of the molding zone, mm 50...300
  • molding cycle s 30-60
  • Power vibration table, kW 11
  • Total installed power, kW 36
  • The frequency of the vibrating table fluctuations, Hz 45...85
  • Hydraulic pressure, MPa 6...12
  • The size of the molding zone, mm x mm 1000 x 600
  • The height of the molding zone, mm 50...300
  • molding cycle s 22-60
  • Power vibration table, kW 11
  • Total installed power, kW 36
  • The frequency of the vibrating table fluctuations, Hz 45...85
  • Hydraulic pressure, MPa 6...12
  • The size of the molding zone, mm x mm 1000 x 600
  • The height of the molding zone, mm 50...300
  • molding cycle s 22-60
  • Power vibration table, kW 11
  • Total installed power, kW 44
  • The frequency of the vibrating table fluctuations, Hz 45...85
  • Hydraulic pressure, MPa 6...12
  • The size of the molding zone, mm x mm 1000 x 600
  • BP-2G-375s Twin-shaft concrete mixer
  • Belt conveyor LC 7-0.5
  • Power vibration table, kW 11
  • Total installed power, kW 30,7
  • Performance of masonry 390h190h188, pieces per hour 540
  • Performance paving tiles 100h200, pcs h 2,200
  • The size of the molding zone, mm x mm 1000 x 600
  • BP-2G-375s Twin-shaft concrete mixer
  • Belt conveyor LC 7-0.5
  • Power vibration table, kW 11
  • Total installed power, kW 30,7
  • Performance of masonry 390h190h188, pieces per hour 540
  • Performance paving tiles 100h200, pcs h 2,200
  • The size of the molding zone, mm x mm 1000 x 600
  • The height of the molding zone, mm 50...300
  • molding cycle s 30-60
  • Power vibration table, kW 11
  • Total installed power, kW 36
  • The frequency of the vibrating table fluctuations, Hz 45...85
  • Hydraulic pressure, MPa 6...12

364 691 BYN

including VAT 20%
  • Vibropress MAXIMAL 2.0
  • MOBIL-20 Concrete Plant
  • Belt conveyor LC 7-0.5
  • Power vibration table, kW 11
  • Total installed power, kW 45,7
  • Performance of masonry 390h190h188, pieces per hour 540
  • Performance paving tiles 100h200, pcs h 2,200

363 926 BYN

including VAT 20%
  • Vibropress MAXIMAL 2.0
  • Concrete plant COMPACT 20
  • Power vibration table, kW 11
  • Total installed power, kW 45,7
  • Performance of masonry 390h190h188, pieces per hour 540
  • Performance paving tiles 100h200, pcs h 2,200

209 582 BYN

including VAT 20%
  • The size of the molding zone, mm x mm 2380 x 600
  • The height of the molding zone, mm 580
  • Power vibrators kW 5.5
  • Total installed power, kW 17,4
  • Hydraulic pressure, MPa 8...12
  • The duration of a complete cycle, 180
  • The number of moldings per hour piece. 20
  • The size of the molding zone, mm x mm 2380 x 600
  • The height of the molding zone, mm 580
  • Power vibrators kW 5.5
  • Total installed power, kW 17,4
  • Hydraulic pressure, MPa 8...12
  • The duration of a complete cycle, 180
  • The number of moldings per hour piece. 20

226 920 BYN

including VAT 20%
  • The size of the molding zone, mm x mm 2500 x 600
  • The height of the molding zone, mm 580
  • Power vibrators kW 5.5
  • Total installed power, kW 17,4
  • Hydraulic pressure, MPa 8...12
  • The duration of a complete cycle, 200
  • The number of moldings per hour piece. 15
  • The size of the molding zone, mm x mm 2380 x 1600
  • The height of the molding zone, mm 280...300
  • Vibrator power, kW 5.5
  • Total installed power, kW 17,4
  • Hydraulic pressure, MPa 8...12
  • The number of moldings per hour piece. 6...12
  • The duration of a complete cycle, 300

19 956 BYN

including VAT 20%
  • The highest limit of the cement dosing (NAP), kg 75
  • The highest limit of the water metering (NAP), kg 40
  • The greatest limit of dispensing chemical additives (NAP), kg 5
  • Dosing accuracy% ±1
  • Maximum discharge time, sec 10
  • The pressure in the pneumatic system, MPa no less 0,6
  • Product particle size, mm max 2

22 617 BYN

including VAT 20%
  • The highest limit of the cement dosing (NAP), kg 150
  • The highest limit of the water metering (NAP), kg 75
  • The greatest limit of dispensing chemical additives (NAP), kg 10
  • Dosing accuracy% ±1
  • Maximum discharge time, sec 10
  • The pressure in the pneumatic system, MPa no less 0,6
  • Product particle size, mm max 2

26 164 BYN

including VAT 20%
  • The highest limit of the cement dosing (NAP), kg 300
  • The highest limit of the water metering (NAP), kg 150
  • The greatest limit of dispensing chemical additives (NAP), kg 20
  • Dosing accuracy% ±1
  • Maximum discharge time, sec 10
  • The pressure in the pneumatic system, MPa no less 0,6
  • Product particle size, mm max 2

36 361 BYN

including VAT 20%
  • The highest limit of the cement dosing (NAP), kg 16 149
  • The highest limit of the water metering (NAP), kg 180
  • The greatest limit of dispensing chemical additives (NAP), kg 2x25
  • Dosing accuracy% ±1
  • Maximum discharge time, sec 10
  • The pressure in the pneumatic system, MPa no less 0,6
  • Product particle size, mm max 2

2 956 BYN

including VAT 20%

6 898 BYN

including VAT 20%

16 752 BYN

including VAT 20%

54 450 BYN

including VAT 20%
  • Width, mm 3860
  • Height, mm 10035
  • Length, mm 10383
  • Weight, kg 4000

36 117 BYN

including VAT 20%
  • Length, mm 6858
  • Width, mm 3700
  • Height, mm 6249
  • Weight, kg 2,500

28 703 BYN

including VAT 20%
  • Length, mm 6858
  • Width, mm 3700
  • Height, mm 6249
  • Weight, kg 2243

34 559 BYN

including VAT 20%
  • Length, mm 8790
  • Width, mm 3700
  • Height, mm 6249
  • Weight, kg 2775

29 280 BYN

including VAT 20%
  • Length, mm 6646
  • Width, mm 3700
  • Height, mm 6249
  • Weight, kg 2173

29 280 BYN

including VAT 20%
  • Length, mm 6646
  • Width, mm 3700
  • Height, mm 6249
  • Weight, kg 2173

48 561 BYN

including VAT 20%
  • Length, mm 11516
  • Width, mm 4047
  • Height, mm 6482
  • Weight, kg 5200

32 288 BYN

including VAT 20%
  • Length, mm 8528
  • Width, mm 3700
  • Height, mm 6249
  • Weight, kg 2528

27 375 BYN

including VAT 20%
  • Length, mm 6284
  • Width, mm 3720
  • Height, mm 5796
  • Weight, kg 2080

30 655 BYN

including VAT 20%
  • Length, mm 7787
  • Width, mm 3720
  • Height, mm 5796
  • Weight, kg 2800

17 243 BYN

including VAT 20%
  • Length, mm 6,595
  • Width, mm 3,600
  • Height, mm 5567
  • Weight, kg 1570

14 598 BYN

including VAT 20%
  • Length, mm 5384
  • Width, mm 3602
  • Height, mm 5567
  • Weight, kg 1407

22 936 BYN

including VAT 20%
  • Length, mm 5717
  • Width, mm 3,600
  • Height, mm 5578
  • Weight, kg 1902

70 385 BYN

including VAT 20%
  • Length, mm 6670
  • Width, mm 2410
  • Height, mm 1133
  • Weight, kg 300
  • Weight, kg 200

8 639 BYN

including VAT 20%

11 163 BYN

including VAT 20%

9 117 BYN

including VAT 20%

27 699 BYN

including VAT 20%
  • Length, mm 6248
  • Width, mm 3,600
  • Height, mm 5578
  • Weight, kg 2120

29 684 BYN

including VAT 20%
  • Length, mm 6770
  • Width, mm 3548
  • Height, mm 5579
  • Weight, kg 2330

30 950 BYN

including VAT 20%
  • The highest limit of the cement dosing (NAP), kg 500
  • The highest limit of the water metering (NAP), kg 250
  • The greatest limit of dispensing chemical additives (NAP), kg 30
  • Dosing accuracy% ±1
  • Maximum discharge time, sec 23
  • The pressure in the pneumatic system, MPa no less 0,6
  • Product particle size, mm max 2

31 396 BYN

including VAT 20%
  • The highest limit of the cement dosing (NAP), kg 600
  • The highest limit of the water metering (NAP), kg 300
  • The greatest limit of dispensing chemical additives (NAP), kg 40
  • Dosing accuracy% ±1
  • Maximum discharge time, sec 20
  • The pressure in the pneumatic system, MPa no less 0,6
  • Product particle size, mm max 2

34 676 BYN

including VAT 20%
  • The highest limit of the cement dosing (NAP), kg 900
  • The highest limit of the water metering (NAP), kg 450
  • The greatest limit of dispensing chemical additives (NAP), kg 60
  • Dosing accuracy% ±1
  • Maximum discharge time, sec 20
  • The pressure in the pneumatic system, MPa no less 0,6
  • Product particle size, mm max 2

41 241 BYN

including VAT 20%
  • The highest limit of the cement dosing (NAP), kg 1,200
  • The highest limit of the water metering (NAP), kg 550
  • The greatest limit of dispensing chemical additives (NAP), kg 70
  • Dosing accuracy% ±1
  • Maximum discharge time, sec 20
  • The pressure in the pneumatic system, MPa no less 0,6
  • Product particle size, mm max 2

43 014 BYN

including VAT 20%
  • The highest limit of the cement dosing (NAP), kg 1800
  • The highest limit of the water metering (NAP), kg 900
  • The greatest limit of dispensing chemical additives (NAP), kg 70(2х70)
  • Dosing accuracy% ±1
  • Maximum discharge time, sec 23
  • The pressure in the pneumatic system, MPa no less 0,6
  • Product particle size, mm max 2

8 563 BYN

including VAT 20%
  • Maximum dosing limit for fibers with a bulk density of 123 kg/m³, no more than, kg 8
  • Dosing accuracy% ±1
  • Productivity, kg/min 1.5 (depending on fiber type)
  • Fiber length, no more than, mm 30
  • Installed power, kW 0,54
  • Length, mm 800(1150)
  • Width, mm 800

11 003 BYN

including VAT 20%
  • The highest limit of the cement dosing (NAP), kg 300
  • Dosing accuracy% ±1
  • Maximum discharge time, sec 10
  • The pressure in the pneumatic system, MPa no less 0,6
  • Product particle size, mm max 2
  • Length, mm High capacity silos
  • Width, mm 905

7 780 BYN

including VAT 20%
  • The capacity of the chamber, m³ 0.07
  • Capacity, cbm h 1,2
  • type of product cement, sypuchyeye
  • The maximum dosing time, with unlimited
  • Power Supply, 380
  • Installed power, kW 0,75
  • The drive gear motor

4 312 BYN

including VAT 20%
  • The largest dosing limit, l 1,000
  • type of product water
  • The amount dosed components 1
  • The minimum dose, l 1
  • Temperature the product, + 5...+ 90
  • Dosing accuracy% ±1
  • Nominal bore pipe diameter DN 25

7 057 BYN

including VAT 20%
  • type of product water
  • The amount dosed components 1
  • The minimum dose, l 1
  • Temperature the product, + 5...+ 90
  • Dosing accuracy% ±1
  • Nominal bore pipe diameter DN 50
  • Nominal flow, m³/h 15

2 478 BYN

including VAT 20%
  • Volume, cu. m. 1
  • Carrying capacity, t 2,5
  • Weight, kg. 260
  • Type of closure manual, two-sector

52 BYN

including VAT 20%

80 BYN

including VAT 20%

3 777 BYN

including VAT 20%
  • Capacity rastarivatelâ, tons 2,35
  • The volume of the cube. m 1,57
  • Email download thaw (optional)
  • MVE300 Vibrator, kW (optional) 00.3
  • Banks thickness, mm 3
  • Productivity, tons hour 40
  • Free falling system optional

4 157 BYN

including VAT 20%
  • Capacity rastarivatelâ, tons 2,35
  • The volume of the cube. m 1,57
  • Email download thaw (optional)
  • MVE300 Vibrator, kW (optional) 00.3
  • Banks thickness, mm 3
  • Productivity, tons hour 40
  • Free falling system optional
  • Capacity rastarivatelâ, tons 2,35
  • The volume of the cube. m 1,57
  • Email download thaw (optional)
  • MVE300 Vibrator, kW (optional) 00.3
  • Banks thickness, mm 3
  • Productivity, tons hour 40
  • Free falling system optional

7 991 BYN

including VAT 20%
  • Weight, kg 2,000
  • The volume of the cube. m 0,56
  • Email download thaw (optional)
  • Vibrator MVE300, KW 00.3
  • Banks thickness, mm 3
  • Productivity, tons hour 40
  • Free falling system there is

9 408 BYN

including VAT 20%
  • Capacity rastarivatelâ, tons 6
  • The volume of the cube. m 4
  • Banks thickness, mm 3
  • Weight, kg 1,010
  • Height, mm 3634
  • Width, mm 2440
  • Tank diameter, mm 2300

1 267 BYN

including VAT 20%
  • Производительность, м³/ч 27
  • power, kWt 1,5
  • Head, m 13.9
  • Weight, kg 38

1 858 BYN

including VAT 20%
  • Производительность, м³/ч 48
  • power, kWt 3
  • Head, m 17
  • Weight, kg 51