Bitumen melting electric
TEPLO BP-1E
74 242 THE VILLAGE
Enquire conditions
and delivery time
We'll call you back within 15 minutes
Specify your requirements
Send prices and terms of delivery
| Bituminous foundry with a boiler on the frame — 1 pc. |
| Block electric heater TENB-6Z, 6 kW — 20 pcs. |
| Automatic control cabinet — 1 pc. |
| Hot oil pump - 1 pc. |
| Flange 1-80-16 Steel 20 GOST 12820-80 (reciprocal) — 1 pc. |
| Gasket A-80-16-PON GOST 15180-86 — 1 pc. |
| Axial indicating thermometer BT-51.211 — 1 pc. |
| Factory filling of the system with thermal oil |
| Expansion tank 0.2 cubic meters. |
| Expansion tank 0.4 cubic meters. |
| Expansion tank 1.0 cubic meters. |
| Expansion tank 1.5 cubic meters |
| Expansion tank 2.0 cubic meters. |
| Expansion tank 3.0 cubic meters |
The BP-1E bitumen smelter is designed for melting bitumen supplied in non-returnable containers and supplying it to bitumen farms.
Melting of bitumen and heating to operating temperature is carried out by supplying heated thermal oil to the registers of the installation. Thermal oil in BP-1E is heated by a thermal oil boiler located on a single BP-1E frame. Using a high-temperature pump, heated oil (140...180 °C) enters the oil register located in the lower part of the smelter. Due to the circulation of thermal oil through the oil register, the bitumen is heated in the loading chamber and the temperature is maintained in the “pool” of the smelter.
Loading of bitumen blocks is carried out with a forklift, through the loading door and installed on supports located inside the loading chamber. The packaged bitumen falls through the hot supports under its own weight and is divided into separate parts. Next, the bitumen goes to the register pipes and into the pool. In the pool bath, the melting of the bitumen is completed and its temperature is brought to the required level.
The melting rate of bitumen depends on the temperature of the thermal oil, the ambient temperature, the grade of bitumen and other factors.
Molten bitumen is pumped through the outlet pipe into the supply tank.
More information about TEPLO bitumen smelters
[parent] => 45 [count] => 6 [filter] => raw )
- Productivity 1 t/hour
- Side loading
- Each container is tested in a certified non-destructive testing laboratory
- Transport dimensions
- 2-year warranty
Technical Features
- Productivity, m 1
- Reject hopper capacity (at a density of 1.8 t/m³), m³ (t) 0,1
- Installed power, kW 125,5
- 23 866 $ Reject hopper capacity (at a density of 1.8 t/m³), m³ (t)
- Reject hopper capacity (at a density of 1.8 t/m³), m³ (t) Reject hopper capacity (at a density of 1.8 t/m³), m³ (t)
- Maximum oil heating temperature, °C 23 866 $
-
The volume of the coolant m3
0.8 - Time to exit to mode, min 30
- Loading opening dimensions (WxH), mm 1300x1400
- Pool volume 1,2
- Weight, kg 2,500
- Length, mm 4104
- Width, mm 2170
- Height, mm 2472
Quality
certificates
Products
in stock
Individual configuration
with prices for each item
Mobile
commissioning
available
Worldwide
delivery
in trucks or containers
Geography of supplies 2011-2026
Own production, in-stock products and
professional team allow us guarantee
most competitive prices, shortest
possible delivery time and high-quality goods
Call, hotline in the Republic of Belarus
Our managers will answer all your questions from Monday till Friday:
from 06:00 a.m. to 05:00 p.m. (GMT+3, Moscow time)
Address: Republic of Belarus, 220073, Minsk, st. Olshevskogo, 20, office. 38a
e-mail: sales@zzbo.ru


Denis Zhilyakov
Director of the branch in the Republic of Belarus
Phone: +7 (963) 914-75-75
e-mail: sales@zzbo.ru
Place your order
We will send you the price,
conditions and terms of delivery
Response within 1 hour
You will get the offer with
individual delivery and payment conditions










