Water boiler VC-10 and the tank for heating water BW 7 in hot water systems, concrete plants

The efficiency of a concrete plant in winter and the demand for its products largely depends on the technical equipment of the batching plant, which allows the customer to produce a concrete mixture at a given elevated temperature (the so-called hot concrete). In accordance with the recommendations of the Research Institute of Concrete Concrete, the temperature of the finished concrete mixture when supplied from the concrete mixer to the automixer should be 21-24 degrees. C. Only if this condition is met in cold weather, when the surrounding air freezes to minus 15 degrees. Ts, builders will receive ready-mixed concrete suitable for use at a temperature not lower than plus 15 degrees. C.


Temperature ratios for water and inert in the wintertime


Practice has confirmed the feasibility of shipping a warm concrete mixture to the customer during the cold season, which allows for a heat supply sufficient to maintain the required temperature at the time of laying, taking into account temperature losses during transportation to the application site. To obtain a warm mixture, the BSU heats the inert components of concrete - sand, crushed stone and gravel, as well as process water for mixing.


In table 1 shows the maximum permissible temperature of the concrete mixture and its components

Table 1

Cementmaximum permissible temperature, degrees C
components when loaded into the mixerconcrete mixture at the outlet of the mixer
waterfillers
Portland slag cement grades 200-300906045
Portland cement grade 300 and pozzolanic Portland cement grade 200805040
Portland cement grade 400 and pozzolanic Portland cement grade 300 and above604035
alumina cement402025

Technical characteristics of the concrete plant heating system


For full operation during the cold period, it is necessary to provide heat to the following positions of the production activity of the concrete plant:

  1. All stages of the production process, including:
  • defrosting, heating and heating of inert materials before feeding into the concrete mixer;
  • heating water for mixing;
  • heating the area for loading concrete mixture into the mixer.
  1. Economic needs of the enterprise, for example:
  • heating of administrative and production premises of a concrete plant;
  • heating water when using a concrete mixer and a brick making machine together;
  • heating water for washing and filling tanks of automixers.

Water boiler VC-10 and the tank for heating water BW 7 in hot water systems, concrete plants
Business for concrete

Table 2 shows the main technical characteristics of the concrete plant heating system, which ensures its normal functioning (production of high-quality products with the parameters specified in the technical specifications plus comfortable working conditions for personnel).

Table 2

Indicator

Value

object heatingWater + inert
plant performancefrom 20 to 100 cubic meters/hour
Installed heat capacityfrom 500 to 4500 kW
The amount of heated waterfrom 6 to 24 cubic meters/hour
The temperature of the heated waterto 70 city. C
inert at the temperature of heating Temperature
air to minus 25 degrees. C
until 15 city. C
Diesel fuel consumption per 1 cubic meter of concrete,
at air temperatures down to minus 25 degrees. C
0,7 – 3,2 l/cubic m
Maximum flow of diesel fuelfrom 14 to 320 l/hour

In particular, for normal operation of a BSU with a capacity of 60-80 cubic meters. m/hour, 3000 - 4000 kW (3-4 MW) of thermal power obtained from an autonomous heating system or central heating and hot water mains is sufficient.

Methods of heating the process water

To heat the inert components of concrete, heat generators and steam generators with a thermal power of 100 to 3000 kW are used, which are spent on thawing frozen lumps of sand and crushed stone in the bunkers of the recreation center and subsequent heating of the materials to the required temperature before feeding them into the concrete mixer for mixing. The coolant (steam or hot air) is supplied to the bunker from a heat source (steam generator or heat generator) and heats the entire working volume along with the inert material present there.

[parent] => 45 [count] => 6 [filter] => raw )

To heat water, a slightly different principle is used, the implementation of which does not require the installation of an extensive system of pipelines, registers or nozzles. Water is heated in a storage tank and dosed into the concrete mixer. To heat water in winter, ZZBO produces the following equipment:


  1. Water heating tank BV-7, in which steam supplied from the PG-1000 steam generator is used to heat water. There is a diluted steam line inside the 7 cubic meter tank. Through it, steam is supplied directly to the water, from the heat of which the water is heated to the required temperature. The tank is equipped with shut-off devices for dispensing hot water for dosing and supplying cold water for filling.
  2. Water heating boiler house VK-10, operating according to a double-circuit heat supply scheme. VK-10 provides hot water productivity of up to 10 cubic meters/hour through the use of water heating in a 1500 liter tank.

    Water boiler VC-water heating installation 10


Recommendations for choosing a


The hot water capacity of water heating equipment must exceed the estimated demand of the concrete mixer for the production of hot concrete with a margin. When calculating the water requirement for mixing, you can focus on its amount within 20% of the loading volume into the concrete mixer. For example, for a concrete mixer BP-2G-750 of a concrete plant of the “Flagman” model with a capacity of 750 liters, approximately 150 liters of water will be needed. To operate according to a cyclogram of 60 operating cycles per hour, the need for hot water will be at least 9000 liters. Obviously, the BV-7 tank will not provide such a need. If a concrete manufacturer has a significant volume of orders for the winter period, then it is better to spend money on purchasing a VK-10 boiler room and be confident in its performance.


conclusion


The presence of equipment for heating water in winter provides certain competitive advantages to a concrete plant, since hot concrete is in high demand among builders.