When choosing a location for a concrete plant, it is important to conduct a thorough survey of the area. In this article, the main aspects of this process are: for open areasAnd for placement inside the workshop.
[parent] => 45 [count] => 6 [filter] => raw )
Many entrepreneurs pay attention only to the size of the site and the availability of electrical networks, but they encounter difficulties when installing equipment. These challenges can be avoided by consulting with equipment manufacturer experts during the location selection phase.
[parent] => 45 [count] => 6 [filter] => raw )

[parent] => 45 [count] => 6 [filter] => raw )
[parent] => 45 [count] => 6 [filter] => raw )
Main aspects of placement and layout of ZZBO equipment
[parent] => 45 [count] => 6 [filter] => raw )
A modern concrete plant of the ZZBO brand consists of the following interconnected objects:
Basic equipment represented by functional modules:
- Cement silos
- Dosing complex
- Concrete mixer
Auxiliary equipment:
- Transformer substation
- Steam boiler and compressor devices
- Water supply and sewerage systems
Production areas intended for:
- Location of main equipment
- Location of warehouses and territories
The main task of placement is to creation of a unified concrete infrastructure. For its technical implementation, ZZBO, acting as a manufacturer and supplier of the BSU, issues the buyer a foundation plan for the equipment site in accordance with the working documentation. The site dimensions are designed for the equipment supplied according to the specification, and take into account its size, weight and layout requirements.
[parent] => 45 [count] => 6 [filter] => raw )
[parent] => 45 [count] => 6 [filter] => raw )

[parent] => 45 [count] => 6 [filter] => raw )
[parent] => 45 [count] => 6 [filter] => raw )
If the placement of a concrete plant is planned on the territory, then the main objectives of the survey include:
[parent] => 45 [count] => 6 [filter] => raw )
Geographical conditions.
Relief analysis (presence of slopes, depressions and other features)
Infrastructure
- Roads and transport: availability of access roads and proximity to main transport arteries.
- Electrical and water resources
- Warehouse space: the ability to organize the storage of materials and finished products.
- Potential logistics opportunities should also be considered at this stage.
Environmental factors
Proximity to natural reservoirs, nature reserves or other protected areas.
Social impact
Opportunity to create new jobs and impact the local economy.
[parent] => 45 [count] => 6 [filter] => raw )
[parent] => 45 [count] => 6 [filter] => raw )

[parent] => 45 [count] => 6 [filter] => raw )
[parent] => 45 [count] => 6 [filter] => raw )
Concrete plant location in the production workshop is a complex task that requires attention to many factors.
[parent] => 45 [count] => 6 [filter] => raw )
Space planning
- Areas for storing raw materials,
- Walkways and driveways, etc.
Foundation and floor:
A reliable foundation and a durable floor that is easily cleaned of dirt and can withstand exposure to chemicals.
Ventilation and air purification system
To remove harmful particles to reduce pollution levels in the workplace.
Energy infrastructure:
- ensuring reliable power supply
- Power selection: taking into account the needs of all units of the plant.
- Protection systems: against overloads and short circuits.
Noise and vibration:
The operation of a concrete plant can create significant levels of noise and vibration; isolated placement of equipment is important to reduce the impact on adjacent premises.
[parent] => 45 [count] => 6 [filter] => raw )

[parent] => 45 [count] => 6 [filter] => raw )
The role of the expert consultation ZZBO a placement of the concrete plant
[parent] => 45 [count] => 6 [filter] => raw )
The manufacturer's specialist is able to objectively assess the situation and conditions in which the concrete plant equipment is supposed to be installed, and compare them with the technical characteristics of systems and individual units.
For example, when a high-voltage power line passes nearby, it is unacceptable to place a high silo underneath it due to the threat of an arc. In this case, a low silo is supplied or the issue of installing a silage can at a distance from the line is resolved. If the external water supply from a well or main does not meet the water consumption requirements for the operation of the BSU, it is recommended to install a storage tank of the appropriate volume. And if the client uses existing old production buildings, a ZZBO specialist will tell you how to more conveniently connect the working units of the concrete production to the existing communications.
[parent] => 45 [count] => 6 [filter] => raw )
A thorough inspection of the territory and a balanced assessment of the manufacturer’s specialist will allow the equipment to be launched on time and efficiently and the specifications of the supplied equipment will be adjusted in a timely manner.