Concrete belongs to the category of building materials that all modern technologies for the construction of civil and industrial buildings are forced to rely on. Currently, the dominant directions in the construction of residential and industrial facilities are:
1. Production of reinforced concrete elements in factories and their subsequent assembly at the construction site.
2. Monolithic housing construction, in which a metal frame enclosed in wooden formwork is filled with concrete mortar.
Both technologies require huge amounts of ready-mixed concrete. The annual demand for this raw material in Russia alone amounts to tens of millions of cubic meters. Here the inexorable logistics of moving ready-mixed concrete takes the reins - the average distance for its transportation is a maximum of 50 km. That is, if builders want to work with high-quality concrete, they must have their own concrete plant or rely on a high-performance RBU located somewhere nearby. Since in such a situation it is impossible to form an all-Russian market for concrete production on the vast territory of Russia, all issues are resolved locally, at the regional levels. This encourages many entrepreneurs to acquire their own concrete plants, since investments in the concrete business quickly pay off.
Typical methodology for assessing the profitability of concrete production
Most feasibility studies and business plans are based on a comparison of the income and cost components of “concrete accounting” in order to estimate the average estimated profit. Using it, it is no longer difficult to calculate the return on investment, that is, the return on investment period. The leader in the production and sales of concrete plants on the Russian market, which is the Zlatoust Concrete Mixing Equipment Plant, which produces its products under the ZZBO brand, readily provides potential customers with business plans developed by the plant’s specialists to assess the profitability of producing various concretes and products made from them using ZZBO equipment. Here, for example, are some aspects of the calculation of the use of a concrete plant of the “COMPACT-30” model for the production of simple concrete of the M100 grade.
1. The cost part takes into account the costs of purchasing concrete components (sand, crushed stone, gravel, cement and water), production costs, and there is even a component for unforeseen expenses. In terms of 1 cubic meter of concrete grade M100, costs for August 2014 amounted to 2,624 rubles.
2. In the revenue part, they are guided by an average price of 3,400 rubles/cubic meter, which, taking into account the simplified tax system, will be 3,208 rubles.
3. Net profit for one cubic meter produced will be 584 rubles.
4. For an 8-hour work shift, the estimated productivity of the COMPACT-30 concrete plant is 240 cubic meters. Then the net profit for such a volume of output will be equal to 140,160 rubles.
5. The cost of investment was obtained by summing up the cost of the concrete plant, equal to 2,868,000 rubles, the costs of transportation to the location (90,000 rubles) and site preparation (30,000 rubles). The cost of installation and commissioning is already included in the price of the plant. The total investment amounted to 2,988,000 rubles.
6. A simple arithmetic division of investments (2,988,000 rubles) by the net profit of one shift (140,160 rubles) gives the figure 21.3 shifts.
instead of the resume
If we add to the costs the costs of registering an enterprise and monthly advertising, we will reach a payback period of within 30 working one-shift days. It can be extremely reduced if the intensity of work requires two-shift work.