Production of concrete products in the winter season

In winter, the operation of concrete plants becomes significantly more difficult. Low temperatures worsen the working conditions of maintenance personnel so much that the human factor begins to affect the quality of equipment maintenance. It is more difficult to carry out the necessary maintenance work on components and assemblies, although it is at low temperatures that the viscosity of the oil increases, which causes a delay in the supply of oil to the contacting surfaces of gearbox parts and other mechanisms. At the same time, the impact strength of the metals from which machine parts are made decreases. Therefore, in the cold season, these units wear out faster than in summer; emergency breakdowns occur more often in winter.


all-season concrete plant


To operate concrete plants in winter conditions, special measures are taken to insulate or thermally insulate equipment and production premises. But no less important is the task of observing the technological parameters of the processes of setting and hardening of the concrete mixture. Concrete is very sensitive to low temperatures. For it, the minimum setting temperature of the components is 5 degrees; at a temperature of plus 20 degrees, the setting speed is already five times higher. When producing concrete, it is very important to prevent its temperature from dropping to zero degrees or below. Then hardening will stop completely, since the free water contained in the concrete mixture freezes when the temperature drops, and the hydration reaction stops. At the same time, internal pressure forces in concrete increase due to an approximately 9% increase in the volume of water when it freezes. These forces are capable of destroying a monolith that has not yet hardened. The most dangerous freezing of concrete is at the cement setting stage.


Knowing the optimal parameters of normal concrete hardening conditions, it is possible to technologically ensure its production at any time of the year. Let's start with preparing the raw materials. Gravel, sand and cement should not be mixed with snow, ice or mud. The concrete mixture is produced in heated rooms. The water must be heated to a temperature of 30 to 80 degrees Celsius. The fillers are also heated using special heat generators BSU, but heating cement is prohibited. The criterion for the temperature of the concrete mixture at the outlet of the concrete mixer is plus 5 degrees C. It is most advisable to produce small-piece concrete products in the winter season, for which the indoor air temperature of plus 10-15 degrees C will be quite optimal for the entire required curing period of the concrete. By fulfilling these simple requirements, you can work profitably all year round, thereby significantly reducing the payback period of a concrete plant.


Production of concrete in winter