A business plan for a concrete plant is drawn up in order to estimate the necessary costs for launching the plant, calculate the income component and, ultimately, determine the payback period.
For a concrete plant that is supposed to be launched directly on the territory of its own construction site, these deadlines should not conflict with the commissioning schedule of the facility under construction, which will be the main consumer of the concrete produced. Although, after the commissioning of the facility, the concrete plant can be dismantled and, after being placed in another territory, continue to be used for commercial production of concrete or for servicing one’s own construction sites. The business plan does not take this into account.
[parent] => 45
[count] => 6
[filter] => raw
)
1. Costs for launching the production capacity of a concrete plant.
1.1. Costs for registering a plant as a legal entity.
It is necessary to determine the organizational and legal form of the enterprise’s status. The cost of preparing the necessary documents, state duties - this is the first component of the costs of launching a plant.
1.2. Lease of territory for the location of the plant and related outbuildings.
1.3. Supply and connection of all necessary communications: electricity, water, sewerage. Conclusion of contracts for payment of commodities. services.
1.4. Pouring the foundation, building or placing mobile utility rooms.
1.5. Delivery, placement, installation of a standard concrete production plant. To do this, you need to buy a concrete mixer or concrete mixer with the parameters specified in the technical design, as well as all other (according to the specification) components and mechanisms.
1.6. Costs for setup and trial runs until the required productivity is achieved.
1.7. Advertising expenses (if necessary).
[parent] => 45
[count] => 6
[filter] => raw
)
2. Material costs.
2.1. Costs for the purchase of cement, sand, crushed stone, special additives (if necessary). These costs are directly related to the plant's target output.
2.2. Costs for consumables that ensure the normal functioning of components and mechanisms of factory equipment. Repair fund, expenses (conditionally normalized) in case of emergency repair work associated with the repair or replacement of failed equipment.
[parent] => 45
[count] => 6
[filter] => raw
)
3. Operating and overhead costs.
3.1. Salaries of full-time and temporary staff.
3.2. Tax deductions and depreciation of equipment.
3.3. Costs for delivering concrete to the pouring site.
3.4. Unaccounted expenses (conditionally constant unforeseen expenses).
Having determined the daily operating time of a concrete production plant (one or two eight-hour shifts), you can calculate the cost of one cubic meter of concrete. By taking the commercial cost per cubic meter of concrete offered by third-party suppliers, you can determine the average estimated profit per month. Then, dividing your costs associated with launching a concrete plant by the average monthly profit, we will obtain its payback period.