Concrete plant FLAGMAN-25
240 311 The village




Enquire conditions
and delivery time

We'll call you back within 15 minutes

Specify your requirements

Send prices and terms of delivery
44 444 The village
- BP-2G-375 Twin-Shaft Concrete Mixer
- Skip (bucket) to load the mixture
- Winch for skip lifting with electric brake
- SMC pneumatic gate - two-side
- Connection set for pneumatic equipment
- Changeable armour, flake type. Material – wear-resistant cast iron 12 mm thick
- Спицы усиленные (стальное литье) крепление типа "кулак"
- Changeable blades. Material: ЧХ16Н2Т cast iron (chromic high alloy wear-resistant)
- Water equilibrium distribution device
- Electricity to connect the remote control
- Maintenance kit (three armor, blade, needle)
- Purchased parts machinery certificates
- Concrete mixer machinery certificate
61 031 The village
- Mounting frame, mobile
- Reinforces points for mixer's mounting
- Cable ducts for electric and pneumatic systems laying
- Bunkers of inert materials (2 x 4m³)
- Pneumatic valves - 2 pieces
- Pneumatic dampers - 2 pieces
- Filter regulator - 1 piece
- Vibrators MVE 3003 - 2 pieces
- Conveyor for inert materials (0-1,000 kg dosage). Belt speed 1.6 m/sec
- Zink plated rollers
- Lined drive drum 7.5 kW
- Drum tension station
- Load cells SBA-2T 2 tons - 4 pieces
- CAS connecting box
- Signal amplifier - weight sensor
20 400 The village
- Mounting frame (powder coating). Weight - 100 kg
- Cement dispenser, dosage - 150 kg (powder coating):
- One input pipe for a screw
- Connecting outer sheath with collar clamps
- Overpressure system
- Unloading disc damper ∅200
- Strain gauges - 3 pcs.
- Signal amplifier - weight sensor
- Pneumatic distributors - 3 pcs.
- Vibrator MVE41 - 1 pc.
- Water dispenser, dosage - 75 liters (powder coating):
- Strain gauges - 3 pcs.
- CAMOZZI d 50 discharging ball pneumatic damper
- Signal amplifier - weight sensor
- Chemical dispenser additives 10 liters stainless steel:
- Strain gauges - 2 pcs.
- CAMOZZI d 50 discharging ball pneumatic damper
- Signal amplifier - weight sensor
22 484 The village
- Automatic operation by pressing "one" button
- Recipe storage database for concrete production
- Programmable Logic Controller
- Touch control panel, diagonal 10 inches, wide viewing angle, TFT-screen, 65,000 colors.
- Сontrol panel case protection - IP54
- Control, protection and switching equipment "Schneider Electric", "Omron", "ABB", "Siemens"
- Manual control panel with ingress protection buttons on mimic panel
- Set of diagrams and instruction manual
1 751 The village
- The pump Calpeda MXH 202E assembled for chemical supply. additives
- Capacity - 80 liters/min
- Power - 0.33 kW
- Weight - 6.9 kg with packaging
- Machinery certificate
1 200 The village
- Pump PSTC 40-125/15 assembled for water supply
- Machinery certificate
72 476 The village
- Metal structures of the insulation frame.
- Ограждающие конструкции - панели типа "сэндвич"
- Viewing windows (PVC, single-chamber double-glazed windows) - 3 pieces
- Insulated door - 1 piece
- Additional elements
- Autonomous air-water heating system for the interior space of the plant
- Kit for assembling structures (hardware, foam, sealant, etc.)
- Internal wiring is: a cable gasket in a metal perforated tray and a metal hose, introductory dispenser VRU
- Lighting of the first floor and the mixer service area, switches, sockets
- Packaging
2 667 The village
- Steel wire rope, for fastening screw
- Sleeve for DC
- Hardware for the RBU assembly (490 units)
- Fasteners (turnbuckles, clips, hooks)
- Acid sealant TempPlus
- Hardware for the component (500 units)
- PVC pipe for vodopodvedeniya (size 2)
- Set of cables
- Kit vodopodvedeniya (pipe bends, sleeves, T-joints)
- Power and control cables, protected by metal hose (in mobile plants they are laid in frame)
- Set of locking sensors and executing mechanisms position sensors (skip, mixer's gate, etc.)
7 538 The village
- Cover of the inert materials hopper (insulated) - 1 pc.
- Mechanism for raising/lowering the lid with a safety system against cable breakage - 1 pc.
- Drive gear motor. Power 1.5 kW - 1 pc.
- drive rack opening - 2 pieces
- The stationary control panel covers the bunkers
2 764 The village
- Universal double row registers heating inert materials hoppers - 2 sets
- coolant type steam (hot air under pressure)
- The thermal load of up to 180 degrees
7 280 The village
- KPTTS.00.000 set consisting of:
- Полный комплект разводки паропроводов (воздуховодов) от теплового центра до регистров установленных в бункерах инертных. Расстояние от теплового центра до завода не более 1,5 метра. Общая протяженность паропроводов (воздуховодов) не более 7 метров
- A set of valves for operation and maintenance of the plant heating system
- The thermal load of up to 180 degrees
16 933 The village
- Rectangular tank, volume 7 m3 with wall thickness 4 mm
- Insulation from min. Vata with a thickness of 80 mm, sheathing from prof. sheet with a thickness of 0.5 mm
- Steam register for heating water
- Electrical equipment: Electric Ten 9 kW to prevent water freezing
- Ball valve with pneumatic drive for filling, ball valves with handle for branch pipes
- Temperature control sensor and thermometer, electrode level sensor
- The control panel is based on a relay thermostat
- Passport and Manual
71 647 The village
- Stainless steel heat exchanger 2 mm thick
- Fan assembled with an electric motor type Fan VR 140-15 No. 8 version 1, 22 kW, 3000 rpm, left. 270. 380/660
- Heat exchanger temperature and hot air supply sensors. Safety thermostat.
- The control cabinet
- Smoke pipe with spark arrester, DN250, height 1200 mm
- Passport and operating manual
4 622 The village
- Cement filter with vibration cleaning FCS-24 NEON assembled
- Filter elements - 14 pieces
- Stainless alloy steel body
- Vibrator - cartridge vibration cleaning system
- Silage setting ring
- Lid
- Machinery certificate
3 596 The village
- RMK-2M washer
- Mounting frame
- Service ladder
- Protective cover of precipitation
- Dispenser capacity 2.35 tons of cement
- Shot peening prior to application to the extent Sa 2 1/2 GOST P ISO 8501-1-2014
- Anti-corrosion protection is made with a two-component primer-enamel PentriProtect PUR 700 based on polyurethane-acrylic resin in the ATIS spray booth
- Knife material: high quality tool steel
- Machinery certificate
15 667 The village
- Lower frame
- Upper frame
- Upper structure for enlarging of loading height
- Sealing protective membrane
- Cutting system made of instrument steel
- Inspection window
- Support screw
- Protective grid
- Vibration mounts – 4 pieces
- Vibrator MVE-3003 - 1 piece
- Manual mechanical hoist - load capacity 2 tons (low-speed)
- Big bags griping cross-beam
- Set of hardware for assembly
- Shot peening prior to application to the extent Sa 2 1/2 GOST P ISO 8501-1-2014
- Anti-corrosion protection is made with a two-component primer-enamel PentriProtect PUR 700 based on polyurethane-acrylic resin in the ATIS spray booth
- Machinery certificate
13 333 The village
- Auger assembly
- Pipe Diameter 168 mm, tube length 9000 mm (folding consists of three parts 3, 3 and 3.35 meters, connects flange)
- Drive: gear motor. Power 5.5 kW
- Inspection window for cleaning and maintenance
- Operational documentation
The work of the winter concrete plant FLAGMAN-25 takes place in automatic mode in accordance with the single button principle. The operator needs to choose grade of concrete (M50 ... M500) and its quantity to be loaded, press the “cycle start” button.
Design of concrete plant - all-weather.
PAM 4.0 SCADA control panel It is located inside the insulated factory case. The case is equipped with three insulated windows, and the door, for visual control by the operator of all operations of the plant.
All equipment of the concrete plant and winterized carcase are installed on a reinforced mounting frame which is placed on a level ground. No foundation or skip pit needed.
The tedded concrete mixer BP-2G-375C is installed on the overpass with the height of unloading the finished mixture is 2.8 meters. The concrete mixer is fitted with a skip for mixture hoisting and feeding.
For storage and dosing of inert materials: dosing complex DKM-8. Inert materials are stored in bunkers, the number of bunkers is 2 x 4 cubic meters. meters, total volume of bunkers 8 cubic meters. meters. Optionally 4 bunkers of 6 cubic meters. meters. Under the bunkers, a conveyor conveyor is installed under which the components are dosing, the components are supplied from the bunkers by opening pneumatic causes. When the required dose of inertia is set, the conveyor is included and inert are supplied to the SKIP, which lifts the components into the concrete mixer. Bunkers are equipped inert materials heating registers during a cold period and heat-insulated covers for protection from precipitation. The concrete plant is equipped service areas heating registers.. All registers are connected to a steam piping system for connection any type of steam generator.
The cement is stored in a special warehouse - cement silo (not included in the basic package). Silos for cement must be selected the rate of two daily stock performance. For feeding cement from a cement silo dispenser must acquire the correct length screw.
Cement silos, silo piping and augers are always available at the ZZBO warehouse in Zlatoust!
Using screw cement is fed into the dispenser DC-150 (tensile weighing 150 kg of cement), in which the dosing as required cement is fed into the mixer.
Water is batched in water dispenser with maximum dosage 100 litres. Also chemical additives dispenser with 10 litres dosage is included in basic configuration.
Mixing all components of the mixture occurs, after obtaining the necessary homogeneity of the mixture, pneumatic surveillance opens and the mixture is unloaded into an auto -mixer or receiving bunker.
Time of one cycle - 45 ... 50 seconds, for one cycle, 0.25 cubic meters are made. m, thus, in an hour, a concrete plant produces 15 ... 25 cubic meters. meters of concrete.
- In the database mobile concrete plant "KFKT-25"
- BP-2G-375C double-sized mixer
- Software on its own SCADA system: accounting for the consumption of materials and equipment operation, remote access and control over the work
- No need for a separate workshop and premises
- No expensive foundation needed
- All year round operation, at any temperatures
Technical Features
- Capacity, cu m per hour 12...25
- Режим работы автомат "одна кнопка"
- Concrete mixer BP-2G-375s
- Bunkers (number x volume m3) 2 x 4 = 8
- Silo capacity (optional), tons from 22
- Design all-weather
- Load of inert materials into the concrete mixer skip
- Total power, kW max 27,2
- Sector gate, pneumatic control
- Weight, kg 15,000
- Height, mm 7,500
- Width, mm 3,960
- Length, mm 10,500

Quality
certificates

Products
in stock

Individual configuration
with prices for each item

Mobile
commissioning
available

Worldwide
delivery
in trucks or containers
Geography of supplies 2011-2024
Own production, in-stock products and
professional team allow us guarantee
most competitive prices, shortest
possible delivery time and high-quality goods
Call, hot line in Belarus
Our managers will answer all your questions from Monday till Friday:
from 06:00 a.m. to 05:00 p.m. (GMT+3, Moscow time)
Address: Republic of Belarus, 220073, Minsk, st. Olshevsky, d. 20, office. 38a
e-mail: sales@zzbo.ru


Denis Zhilyakov
Director of a branch in the Republic of Belarus
Phone: +7 (951) 230-90-16
e-mail: sales@zzbo.ru
Place your order
We will send you the price,
conditions and terms of delivery

Response within 1 hour

You will get the offer with
individual delivery and payment conditions